Laserfiche WebLink
a. Application processing fees and minimum plan review fees are due at time of submittal of <br /> construction documents. <br /> b. Additional plan review fees,minimum inspection fees and administrative fees are calculated <br /> on approval of project and shall be paid prior to issuance of permit. <br /> c. Permit holder is responsible for any additional inspection fees incurred,and shall be paid <br /> prior to final inspection. <br /> 3. Prior to occupancy of new business, the tenant shall contact South San Joaquin County Fire <br /> Authority for anew business inspection. Additional fees maybe required for New Business,Annual <br /> and Operational Fire Permits. All fees shall be paid prior to approval of inspections. <br /> 4. Prior to construction,all-weather fire apparatus access roads shall be installed. Fire apparatus access <br /> roads during construction shall have a minimum 20' unobstructed width in accordance with CFC <br /> §503. <br /> 5. All hydrants shall be installed,inspected and tested prior to bringing combustible materials onsite, <br /> including storage. <br /> 6. Knox boxes shall be required for all buildings and gates. The operator of the building shall <br /> immediately notify the Fire Authority and provide the new key where a lock is changed or rekeyed. <br /> The key to such shall be secured in the key box. <br /> 7. Building and each tenant space shall be provided with approved address identification in accordance <br /> with CFC§505. <br /> 8. Additional comments may occur upon submittal of construction documents. <br /> Feel free to contact our offices,should you have any questions. <br /> Thank you, <br /> Courtney Wood <br /> Fire Plans Examiner <br /> (209)831-6707 main line <br /> courtne .wood u s'cfrc.or <br /> cc:fire.plancheck@sjctirc.org,permit file <br /> -End- <br /> 2 <br /> Planning Commission Staff Report, PA-1800316(UP) 65 <br /> Response Letters <br />