My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
18846
>
3000 – Underground Injection Control Program
>
PR0546051
>
COMPLIANCE INFO_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:26 PM
Creation date
5/19/2021 9:59:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3000 – Underground Injection Control Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 1
RECORD_ID
PR0546051
PE
3030
FACILITY_ID
FA0003883
FACILITY_NAME
VICTOR FINE FOODS
STREET_NUMBER
18846
Direction
N
STREET_NAME
STATE ROUTE 99
City
LODI
Zip
95240
APN
01709051
CURRENT_STATUS
02
SITE_LOCATION
18846 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> VFF DEEP INJECTION WELL NO. 1 <br /> Drilling History <br /> Page S <br /> 3/18/90 <br /> Ran 2832 ' of 7" 23 lb K-SS , 8 Rd , LT & C casing. Shoe at 2829' <br /> and float collar at 2786 ' . RU Halliburton and cemented casing <br /> with 668 sacks Halliburton light , S. 2% gel , followed by 1SO sacks <br /> Class G and 1% CaC12 . Displaced with 100 bbl of mud and 7 bbl of <br /> water . Got 1-1/2 bbl of cement returns . CIP at 0622 hrs'. WOC . <br /> Cut off 7" and 10-3/4" casing . Cement settled back to 75 ' below <br /> GL . Topped off with 34 sacks Class G and 3% CaC12 pumped through <br /> 3/4" pipe at 75 ' below GL . <br /> 3/19/90 <br /> Welded on 7" casing head and tested to 1000 psi - okay . Set BOP <br /> and nippled up . Tested blind rams to 1400 psi . MU BHA with 6- <br /> 1/4" bit . RIH. Tested pipe rams to 1000 psi . Drilled to 2830 ' <br /> ( 1 ' below casing shoe) and POH . <br /> 3/20/90 <br /> MU WSO test tool and RIH . Set packer in 7" casing and opened <br /> tool at 0112 hrs . Very light blow ; dead after 48 min. Shut in <br /> 30 min , then POH. Total fluid rise = SO ' , all drilling mud . MU <br /> BHA and RIH . Circulated . Performed leak off test. (results <br /> below) . Third stroke and seventh stroke were missed because pump <br /> controls made it difficult to pump one stroke at a time. Pres- <br /> sure was observed between strokes and there was no bleed-off <br /> until last stroke . Final pressure (900 psi ) dropped 2S psi in 3 <br /> minutes . <br /> Pump Strokes - 0 2 + 5 6 8 <br /> WHP(Psig) - O O 3SO S10 650 900 <br /> Reamed and cleaned out to 2887 ' . POH. Changed to 4- 3/4" drill <br /> collars . RIH. Reamed from 2978 ' to 3090 ' . Circulated and <br /> tripped for new bit . <br /> 3/21/90 <br /> RIH . Reamed from 3090 ' to 3376' . Circulated , wiped hole and <br /> circulated clean . POH. MU liner . RIH and hung liner one foot <br /> off bottom at 3375 ' . Top of hanger at 2771 ' . Liner consists of <br /> 14 joints of S-1/2" 17 lb K-SS smis , Security flush joint , slot- <br /> ted 2 , 813 ' - 3 , 373 ' with 0 . 040" x 2 . 5" slots , 96 slots/ft . Bull <br /> nose and bailer plate on bottom. Top 40 ' of top joint is blank , <br /> with 8rd LT & C collar on top. Hanger (2 . 17 ' long) is Baker <br /> Simplex , mechanical set . <br />
The URL can be used to link to this page
Your browser does not support the video tag.