Laserfiche WebLink
VFF DEEP INJECTION WELL NO. 1 <br /> Drilling History <br /> Page 6 <br /> RIH with open ended drillpipe to bottom and displaced mud out of <br /> hole with 20 bbls water followed by 240 bbls of KCl water . POH <br /> LDDP. <br /> 3/22/90 <br /> Finished laying down drillpipe. Removed BOP and installed tubing <br /> gate valve. Released rig at 0900 hrs . <br />