Laserfiche WebLink
SUMMARY OF CHANGES BETWEEN THE DRAFT <br /> AND FINAL PERMITS <br /> (1) The permittee is now required to retain the services of an <br /> outside firm to sample, transport, and analyse the samples <br /> specified in the monitoring plan. <br /> (2) Certain changes were made to reflect 'as-built' specifica- <br /> tions of the well and to allow more convenient monitoring and <br /> sampling. <br />