My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
18846
>
3000 – Underground Injection Control Program
>
PR0546051
>
COMPLIANCE INFO_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:26 PM
Creation date
5/19/2021 9:59:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3000 – Underground Injection Control Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 1
RECORD_ID
PR0546051
PE
3030
FACILITY_ID
FA0003883
FACILITY_NAME
VICTOR FINE FOODS
STREET_NUMBER
18846
Direction
N
STREET_NAME
STATE ROUTE 99
City
LODI
Zip
95240
APN
01709051
CURRENT_STATUS
02
SITE_LOCATION
18846 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
applicant to conduct tests of the injection zone during and after construction of the <br /> well. This data will be reviewed by the EPA before the applicant will be allowed to <br /> commence injection. <br /> 9. BASIS FOR DRAFT PERMIT CONDITIONS <br /> a. Well Desien & Construction Reauirements <br /> The completed injection well will consist of surface instrumentation, conduc- <br /> tor pipe, surface casing, long casing, injection tubing, an isolation packer, and a <br /> slotted liner. <br /> The surface instrumentation will include a dual pen, chart pressure recorder <br /> that will continuously measure the injection wellhead pressure and annulus pressure. <br /> Other surface instrumentation includes a continuous flow recorder and a bimetal <br /> dial thermometer on the injection line. <br /> The conductor pipe will be completed to about 30 feet and be 16 inches or <br /> more in diameter. The surface casing will be 10 inch diameter casing meeting 40 <br /> CFR requirements. It will be run from the surface to a depth of about 1700 feet or <br /> 100 feet below the base of fresh water. The long casing is 7" in diameter and runs <br /> from the surface to about 2700 feet. <br /> As required by 40 CFR 146.12, the waste water is to be injected through <br /> tubing with a packer set near the bottom of the long casing. The tubing will be a 4 <br /> inch O.D. tubing that is commonly used in oil field injection wells. The packer is a <br /> hydraulically set type that holds against pressure from above and below. After the <br /> packer is set, the annulus is pressurized and the pressure will be recorded con- <br /> tinuously to detect leaks. <br /> A conventional slotted liner, as opposed to a cased-through, jet perforated <br /> completion, will be used for the VFF injection well. The slotted liner completion <br /> was chosen because of its greater flow capacity at lower pressures. <br /> The Agency may permit small deviations from these construction specifica- <br /> tions if required by circumstances at the site. <br /> b. Oaeration <br /> The draft permit requires the permittee to inject only the non-hazardous liq- <br /> uid wastes described in Section 3 of this fact sheet. The applicant is prohibited <br /> from injecting any fluid which would cause a violation of drinking water standards <br /> as set forth in 40 CFR 142. <br /> The injection zone shall consist of the Domengine Formation and any <br /> suitable formation below the Domengine. All injection shall take place below the <br /> Nortonville Shale which may also be referred to here as the 'confining layer'. <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.