Laserfiche WebLink
-I 1 711' <br /> 4 . Logs and Tests [ 5146 . 12(d) ] <br /> The appropriate logs and tests as specified in Part III , Section <br /> A, of this permit , shall be conducted during the drilling and <br /> construction of the well. A descriptive report interpreting the <br /> results of such logs and tests shall be prepared by a knowledge- <br /> able log analyst and submitted to the Director. <br /> 5 . Construction Changes <br /> The permittee shall give advance notice, to the Director for <br /> review, of any planned changes in the construction of the per- <br /> mitted injection well . Unless approval is given by the Director , <br /> no significant deviations from the above construction plan will <br /> be authorized. <br /> B. OPERATION <br /> During the period beginning on the effective date of this permit <br /> and ending ten years from the effective date of this permit , the <br /> permittee is authorized to inject only non-hazardous pretreated <br /> process wastewater generated by the onsite meat processing plant <br /> and extracted groundwater into the injection well under the fol- <br /> lowing conditions: <br /> 1. Injection Formation <br /> Injection shall be limited to the Domengine Formation in the sub- <br /> surface interval between approximately 2650 feet and 3150 feet. <br /> 2. Confining Laver <br /> The injection formation is confined by the Nortonville Formation <br /> which immediately overlies the Domengine Formation from ap- <br /> proximately 2375 feet to 2650 feet. <br /> 3 . Iniection Pressure Limitation [§146 . 13 (a) ] <br /> Injection pressure at the wellhead shall not exceed a maximum <br /> which shall be calculated so as to assure that the pressure in <br /> the injection zone during injection does not initiate new frac- <br /> tures or propagate existing fractures in the injection zone. In <br /> no case shall injection pressure initiate fractures in the con- <br /> fining zone or cause the movement of injection or formation <br /> fluids into an underground source of drinking water. The maximum <br /> injection pressure , measured at the wellhead, shall not exceed <br /> 810 psig. <br /> 13 <br />