Laserfiche WebLink
D. REPORTING REQU I REMENTS [ §146 . 13 (C ) <br /> 1 . Quarterly reports <br /> The permittee shall submit short and accurate quarterly reports <br /> to the Director containing the following information: <br /> (a) Results of the injection fluid analyses specified in <br /> permit condition Part II , Section C , Item 2. <br /> (b) Daily and monthly average , as well as daily and monthly <br /> maximum and minimum values for the continuously monitored <br /> parameters specified in Part II , Section C , Item 3 . <br /> (c ) Equipment calibration. <br /> (d) A narrative description of all non-compliance which oc- <br /> curred during the reporting period. <br /> 2. Reports on Well Tests and Workovers [ §146 . 13 (c ) ( 2) ] <br /> In the first quarterly report after the activity the permittee <br /> shall report to the Director the results of the following: <br /> (a) mechanical integrity tests ; <br /> (b) other tests required by this permit ; <br /> (c ) any well workovers ; and <br /> (d) the completion of any conditions included in Part III of <br /> this permit. <br /> The permittee shall notify the Director of any scheduled mechani- <br /> cal integrity tests at least 30 days prior to such demonstration <br /> as required by Part I , Section H, of this permit . <br /> 3 . Reporting of Operational Malfunctions <br /> The permittee shall report to the Director any noncompliance pur- <br /> suant to Part II , Section C , Item 4. Any information shall be <br /> provided orally within 24 hours of the noncompliance. A written <br /> submission shall also be provided within five ( 5 ) days on the <br /> noncompliance. The following shall be included as information <br /> which must be reported both orally and written: <br /> (a) a description of the noncompliance and its cause ; <br /> (b) the period of the noncompliance ; <br /> (c ) if the noncompliance has not been corrected, the an- <br /> ticipated time it is expected to continue ; and <br /> 17 <br />