Laserfiche WebLink
F Automatic alarms and shut-Off devices. :A <br /> The permittee shall install automatic alarms and shut-off <br /> devices which will immediately notify the operators of a <br /> malfunction in the event that the injection pressure at <br /> the well head exceeds the maximum injection pressure <br /> authorized by this permit. The automatic alarms shall <br /> also notify the operators of a significant change in the <br /> annular fluid volume and pressure in accordance with Part <br /> II , Section B, item 6 , of this permit. <br /> The equipment shall be installed and operating prior to <br /> commencing injection of waste fluid into the injection <br /> well. <br /> G) Plugging and abandonment plan <br /> The permittee shall submit a complete plugging and aban- <br /> donment plan in accordance with Part I , Section G , of <br /> this permit. The plugging and abandonment plan shall <br /> provide all cost estimates for supplies , use of equip- <br /> ment , and services necessary to properly plug and abandon <br /> the well. The information submitted shall include a com- <br /> pleted EPA Form 7520-14 , Plugging and Abandonment Plan. <br /> H) Injection fluid analysis <br /> The permittee shall submit a complete characterization of <br /> the waste stream in accordance with 40 CFR <br /> §146 . 12(c) (2) ( ii) and §146 . 14(a) (7) ( iii ) . At least 30 <br /> days prior to collecting the representative sample , the <br /> permittee shall submit a plan to EPA which indicates the <br /> constituents that will be tested for in the waste stream <br /> and the test methods that will be used. This plan must <br /> be approved by EPA before the permittee shall collect the <br /> samples for analysis. <br /> 22 <br />