Laserfiche WebLink
SUMMARY OF CHANGES BETWEEN THE DRAFT <br /> AND FINAL PERMITS <br /> (1) The list of organizations receiving the quarterly injectate <br /> monthly reports has been expanded. <br /> (2 ) A requirement for installation and maintenance of an <br /> automatic shut down system has been added. <br /> (3) A requirement specifying that injection may occur only when <br /> a trained operator is present has been added. <br /> (4 ) Provision is made for a reduction in the frequency of <br /> monitoring of the injectate for certain organic compounds <br /> provided those compounds are not detected in the first year of <br /> injection. <br /> ISI <br />