My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
18846
>
3000 – Underground Injection Control Program
>
PR0546051
>
COMPLIANCE INFO_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:26 PM
Creation date
5/19/2021 9:59:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3000 – Underground Injection Control Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 1
RECORD_ID
PR0546051
PE
3030
FACILITY_ID
FA0003883
FACILITY_NAME
VICTOR FINE FOODS
STREET_NUMBER
18846
Direction
N
STREET_NAME
STATE ROUTE 99
City
LODI
Zip
95240
APN
01709051
CURRENT_STATUS
02
SITE_LOCATION
18846 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
shall not be resumed until the Director gives approval to recom- <br /> mence injection. The permittee shall notify the Director of the <br /> loss of mechanical integrity in accordance with the reporting <br /> procedures in Part I, Section E, item 12 (d) . The permittee shall <br /> take such actions as deemed ;necessary by the Director to deter- <br /> mine the extent that fluids may have moved into any USDWs, in- <br /> cluding, if deemed necessary, the installation of monitoring <br /> wells. <br /> 5. Mechanical Integrity Demonstration Request From Director <br /> The Director may, by written notice, require the permittee to <br /> demonstrate mechanical integrity at any time. <br /> I. FINANCIAL RESPONSIBILITY <br /> 1. Financial Responsibility <br /> The permittee is required to maintain financial responsibility <br /> and resources to close, plug, and abandon the underground injec- <br /> tion operation in a manner consistent with the underground injec- <br /> tion control regulations. The financial statements shall be up- <br /> dated periodically, and the Director may require reports of <br /> financial condition from the applicant at any time. Attachment R <br /> provides a schedule for periodic updating of the financial infor- <br /> mation and the cost estimates for plugging and abandonment of the <br /> well. <br /> 2 . Notification <br /> The owner or operator must also notify the Director by certified <br /> mail of the commencement of voluntary OR INVOLUNTARY proceedings <br /> under Title 11 (Bankruptcy) , U. S . Code naming the owner or <br /> operator as debtor, within 10 business days after the commence- <br /> ment of the proceeding. A guarantor of a corporate guarantee <br /> must make such a notification if he is named as debtor, as re- <br /> quired under the terms of the guarantee. <br /> J. CORRECTIVE ACTION <br /> This permit is for a new injection well, therefore, no corrective <br /> action for prior and continuing releases from the injection well <br /> will be required pursuant to Section 206 of the Hazardous and <br /> Solid Waste Amendments (HSWA) of 1984. <br /> No corrective action for wells located within the Area of Review <br /> will be required pursuant to 40 CFR §144.55 and 40 CFR §146.7 be- <br /> cause there are only two wells within a three mile radius of the <br /> injection well that penetrate the injection zone and both these <br /> wells are properly plugged. <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.