My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
18846
>
3000 – Underground Injection Control Program
>
PR0546051
>
COMPLIANCE INFO_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:26 PM
Creation date
5/19/2021 9:59:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3000 – Underground Injection Control Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 1
RECORD_ID
PR0546051
PE
3030
FACILITY_ID
FA0003883
FACILITY_NAME
VICTOR FINE FOODS
STREET_NUMBER
18846
Direction
N
STREET_NAME
STATE ROUTE 99
City
LODI
Zip
95240
APN
01709051
CURRENT_STATUS
02
SITE_LOCATION
18846 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART III <br /> Information to be submitted to the Director for review before in- <br /> jecti.on. will .be .authorized.. - <br /> A) Logs and tests during drilling and construction <br /> (1) Porosity tools <br /> - density log <br /> - neutron log, <br /> - sonic log <br /> (2) Lithology tools <br /> - gamma ray log <br /> - spontaneous-potential (SP) log <br /> (3). Resistivity tools <br /> - spherically focused log <br /> - dual induction log <br /> - deep induction <br /> - medium induction <br /> (4) Borehole tool <br /> - caliper log <br /> (5) Mechanical integrity tools <br /> - cement bond log <br /> - casing collar locator <br /> - temperature log <br /> - spinner survey <br /> - radioactive tracer survey <br /> B) Injection zone information <br /> (1) formation fluid pressure (reservoir pressure) <br /> (2) formation temperature <br /> (3) formation fracture pressure at the top of the forma- <br /> tion (contact between injection and confining forma- <br /> tions) determined by step-rate test or other ap- <br /> propriate test if approved by the Director <br /> 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.