My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
18846
>
3000 – Underground Injection Control Program
>
PR0546051
>
COMPLIANCE INFO_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:26 PM
Creation date
5/19/2021 9:59:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3000 – Underground Injection Control Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 1
RECORD_ID
PR0546051
PE
3030
FACILITY_ID
FA0003883
FACILITY_NAME
VICTOR FINE FOODS
STREET_NUMBER
18846
Direction
N
STREET_NAME
STATE ROUTE 99
City
LODI
Zip
95240
APN
01709051
CURRENT_STATUS
02
SITE_LOCATION
18846 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment Q <br /> Plugging and Abandonment Plan <br /> Victor Fine Foods Deep Injection Well #1 <br /> Plugging and abandonment of the injection well will be done in <br /> the following manner: <br /> 1. Move in and rig up abandonment rig. Remove wellhead tree, <br /> then install and activate Blowout Prevention Equipment (BODE) . <br /> Unseat packer and pull 4-1/2 inch tubing and packer from the <br /> hole. <br /> 2 . Make a bailer run to check for fill. The depth of fill <br /> should be at least 50 feet below the casing shoe. Injection <br /> waste fluids will be flushed out of the injection casing by <br /> injecting sufficient freshwater into the well. <br /> 3 . Run in hole with 4-1/2 inch tubing and 2-7/8 inch tubing <br /> stinger to the top of fill. <br /> 4 . Cement well from bottom to top with common portland <br /> cement/sand mix, withdrawing the tubing strings in stages as <br /> the cement is pumped in. <br /> 5. Remove BOPE and lay down and move off rig. <br /> 6. Cut off wellhead and weld a steel plate 3/8-inch thick to <br /> cap off inner casing (7 inch) . The ground will be leveled and <br /> an abandonment marker posted with pertinent well information. <br /> 7 . Cost estimate at effective date of this permit: $20, 000 <br /> 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.