My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
10878
>
2300 - Underground Storage Tank Program
>
PR0231598
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:18 PM
Creation date
5/19/2021 10:36:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231598
PE
2361
FACILITY_ID
FA0001146
FACILITY_NAME
MORADA CHEVRON FAST N EASY #60*
STREET_NUMBER
10878
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
APN
08607002
CURRENT_STATUS
01
SITE_LOCATION
10878 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN J 0 A Q I I I Irl Environmental Health Department <br /> CCUNT <br /> Underground Storage Tank Program Inspection Report <br /> Facility Name: Facility Address: Date: <br /> MORADA CHEVRON FAST N EASY#60* 10878 N HWY 99 , STOCKTON May 26, 2021 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 208 CCR 2716(a-e) Failure to comply with the designated operator inspection requirements. <br /> OBSERVATION: <br /> -The designated operator failed to check and note the correct test dates on the following designated operator <br /> inspection report: <br /> -6/19/20-monitoring certification, spill container testing, overfill prevention testing <br /> -7/22/2020 to 1/21/2021-overfill prevention testing <br /> -The designated operator inspections for the following months were performed more than 30 days after the previous <br /> inspection: <br /> - Initial inspection on 6/19/2020, next inspection performed on 7/22/2020(33 days) <br /> - Initial inspection on 8/21/2020, next inspection performed on 9/25/2020(35 days) <br /> - Initial inspection on 11/18/2020, next inspection performed on 12/21/2020 (33 days) <br /> - Initial inspection on 2/17/2021, next inspection performed on 3/21/2021 (32 days) <br /> - Initial inspection on 3/21/2021, next inspection performed on 4/21/2021 (31 days) <br /> -The designated operator failed to check and note all required items on the visual inspection reports. The incorrect <br /> and missing information included the following from the inspection reports: <br /> -CERS ID number was missing from 6/19/2020 to 9/25/2020 and 2/17/2021 <br /> -Name of operator was missing from 6/19/2020 to 5/21/2021 <br /> -Spill container testing was marked as fail on 7/22/2020 DO report but passing on all others <br /> -Owner/operator did not respond to all compliance issues listed in section 3 on 9/25/2020, 11/18/2020 to <br /> 1/21/2021, 3/21/2021 <br /> -Designated operator reports were not signed within the required time frame. <br /> -The 8/21/2020 designated operator report was not signed by the owner/operator <br /> REGULATION GUIDANCE: <br /> -During the inspection, the designated operator shall check that all required testing and maintenance for the UST <br /> system have been completed and document the dates they were done. <br /> -The designated operator visual inspections shall be conducted within 30 days or less of the previous inspection. <br /> -During the visual inspection,the designated operator shall check that all required testing and maintenance for the <br /> UST system have been completed and shall check all required items on the report. <br /> -Within 48 hours of the completion of the designated UST operator visual inspection,the designated operator shall <br /> sign and provide the owner or operator with a copy of the inspection report. Within 72 hours of being provided a <br /> signed copy of the report,the owner or operator shall provide a description of each corrective action taken or to be <br /> taken and shall sign and date the report, acknowledging the identified compliance issues. <br /> CORRECTIVE ACTION: <br /> -Ensure that designated operators performing inspections at this facility are including all of the required information <br /> on the reports. <br /> -Ensure that all designated operator inspections are performed within the required time frames. <br /> -Ensure all designated operator inspection reports are completed and signed within the required time frame in the <br /> future. <br /> This is a repeat violation, Class II. <br /> FA0001146 PR0231598 SCO01 05/26/2021 <br /> EHD 23-01 Rev.9/16/2020 Page 6 of 9 Underground Storage Tank Program OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />
The URL can be used to link to this page
Your browser does not support the video tag.