My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3250
>
2300 - Underground Storage Tank Program
>
PR0232224
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2022 8:36:43 AM
Creation date
5/20/2021 11:26:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0232224
PE
2361
FACILITY_ID
FA0001877
FACILITY_NAME
SINCLAIR/DINO MART
STREET_NUMBER
3250
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
08240009
CURRENT_STATUS
01
SITE_LOCATION
3250 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for SINCLAIR/DINO MART as of July 19 , 2021 <br /> Open violations from May 26 , 2021 inspection <br /> Violation #109 - Failure to submit " Designated Underground Storage Tank Operator Identification Form" <br /> within 30 days . <br /> OBSERVATION A new designated operator, David Turner, conducted an inspection on April 1 , 2020 , and <br /> notification was not provided to the EHD within 30 days of the change . <br /> REGULATION GUIDANCE: The owner or operator shall submit a " Designated Underground Storage Tank Operator <br /> Identification Form " no later than 30 days after any change in the designated UST operator(s) . <br /> CORRECTIVE ACTION : Immediately log into the California Environmental Reporting System ( CERS ) at <br /> http : //cers. calepa . ca . gov and upload the notification identifying all the designated operators for this facility. <br /> ❑ This violation was corrected 11This violation will be corrected by (date) . <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> Violation #115 - Failure to submit " Monitoring System Certification Form " within 30 days of completion of <br /> the test. <br /> OBSERVATION A monitoring system certification , leak detector testing , and spill container testing were performed <br /> on May 30 , 2019 and May 26 , 2020 . A test report has not been submitted to the EHD or the California <br /> Environmental Reporting System (CERS ) . <br /> REGULATION GUIDANCE: A copy of the test report must be submitted within 30 days of the test. <br /> CORRECTIVE ACTION : Immediately provide this report to the EHD . <br /> ❑ This violation was corrected ❑ This violation will be corrected by ( date) . <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> Page 2 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.