Laserfiche WebLink
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for SINCLAIR/DINO MART as of July 19 , 2021. <br /> Open violations from May 26 , 2021 inspection <br /> Violation #122 - Failure to implement corrections and submit written response within 30 days of receiving <br /> the report. <br /> OBSERVATION An inspection was last done on May 26 , 2020 and an inspection report was issued identifying <br /> information to be submitted to bring this site into compliance . This information was required to be submitted by <br /> June 25 , 2020 . This information has not been received resulting in a non -compliant status for this facility. <br /> REGULATION GUIDANCE: An operator that receives an inspection report shall have 30 days to implement the <br /> corrections specified in the inspection report and comply with permit conditions . The corrective action shall include <br /> all of the recommendations made in the report. The operator shall submit a written response that includes a <br /> statement documenting corrective actions taken or proposing corrective actions which will be taken . <br /> CORRECTIVE ACTION: Ensure that a written response documenting corrective actions taken or proposed is <br /> submitted and all corrections implemented within 30 days of receiving an inspection report. <br /> ❑ This violation was corrected ❑ This violation will be corrected by ( date) : <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> Violation #203 - Failure to maintain monitoring records for 36 months and maintenance records for 60 <br /> months. <br /> OBSERVATION Maintenance and monitoring records for the last three years were not found on site . The following <br /> documents were not located : <br /> -May 26 , 2020 monitoring system certification <br /> -May 30 , 2019 monitoring system certification <br /> - May 24 , 2018 monitoring system certification <br /> REGULATION GUIDANCE: These records shall be maintained on site for at least three years . Monitoring records <br /> include : ( 1 ) date and time of all monitoring or sampling ; (2 ) monitoring equipment calibration and maintenance <br /> records ; (3 ) results of any visual observations ; (4 ) results of sample analysis performed a lab or in the field ; ( 5 ) logs <br /> of all readings of gauges or other monitoring equipment , ground water elevations , or other test results ; (6 ) results of <br /> inventory readings and reconciliations . <br /> CORRECTIVE ACTION : Immediately locate and maintain all missing maintenance and monitoring records for the <br /> last three years on site and submit copies to the EHD . <br /> ❑ This violation was corrected ❑ This violation will be corrected by (date) . <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> Page 3 of 8 <br />