My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3250
>
2300 - Underground Storage Tank Program
>
PR0232224
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2022 8:36:43 AM
Creation date
5/20/2021 11:26:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0232224
PE
2361
FACILITY_ID
FA0001877
FACILITY_NAME
SINCLAIR/DINO MART
STREET_NUMBER
3250
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
08240009
CURRENT_STATUS
01
SITE_LOCATION
3250 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ® Manufacturer ® Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ® Vacuum ❑ Hydrostatic <br /> Test Equipment Used: 20' Hg vacuum gauge <br /> Tank ID T1 87 Master T2 87 Syphon T3 91 <br /> Tank Manufacturer Uknown Uknown Uknown <br /> Tank Capacity 12,000 12,000 12,000 <br /> Test Start Time 6:OOam 6:15am 7:OOam <br /> Initial Reading -10' Hg -10' Hg -10' Hg <br /> Test End Time 7:OOam 7:15am 8:OOam <br /> Final Reading -10' Hg -10' Hg -10' Hg <br /> Change in Reading 0 change 0 change 0 change <br /> Pass/Fail Criteria 0 change/1 hr 0 change/1 hr 0 change/1 hr <br /> Tightness Test Results ® Pass ❑ Fail I ® Pass ❑ Fail I ® Pass ❑ Fail ❑ Pass ❑ Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ® Manufacturer ® Industry Standard ❑ Professional Engineer <br /> Test Type ® Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: 10 psi pressure gauge <br /> Pipe Run ID T1 87 master T2 87 syphon T3 91 Vapor pot <br /> Pipe Manufacturer Fiberglass Fiberglass Fiberglass Fiberglass <br /> Test Start Time 6:OOam 6:OOam 6:30am 6:30am <br /> Initial Reading 5 psi 5 psi 5 psi 5 psi <br /> Test End Time 7:OOam 7:OOam 7:30am 7:30am <br /> Final Reading 5 psi 5 psi 5 psi 5 psi <br /> Change in Reading 0 Change 0 Change 0 Change 0 Change <br /> Pass/Fail Criteria 0 change - 1 hr 0 change - 1 hr 0 change - 1 hr 0 change - 1 <br /> Tightness Test Results ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.