My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3250
>
2300 - Underground Storage Tank Program
>
PR0232224
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2022 8:36:43 AM
Creation date
5/20/2021 11:26:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0232224
PE
2361
FACILITY_ID
FA0001877
FACILITY_NAME
SINCLAIR/DINO MART
STREET_NUMBER
3250
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
08240009
CURRENT_STATUS
01
SITE_LOCATION
3250 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by ® Manufacturer ® Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum ® Hydrostatic <br /> Test Equipment Used: Caldwell Sump Tester <br /> Sump/UDC ID T1 87 Master T2 87 Syphon T3 91 Turbine All Tanks <br /> Turbine Sump Sump Sump Piping Sump <br /> Sump Manufacturer Fiberglass Fiberglass Fiberglass Fiberglass <br /> Sump Depth (inches) 44 inches 44 inches 44 inches 58 inches <br /> Sump Bottom to Top of 17 inches 15 inches 18 inches 40 inches <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 6:30am 6:30am 6:45am 6:45am <br /> Initial Reading 1St Ring 1St Ring 1St Ring 1St Ring <br /> Test End Time 7:OOam 7:OOam 7:15am 7:15am <br /> Final Reading 1St Ring 1St Ring 1St Ring 1St Ring <br /> Change in Reading 0 Change 0 Change 0 Change 0 Change <br /> Pass/Fail Criteria 0.05 in 30 min. 0.05 in 30 min. 0.05 in 30 min. 0.05 in 30 min. <br /> Tightness Test Results ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail <br /> Sump/UDC ID Vapor Pot UDC 1-2 UDC 3-4 UDC 5-6 <br /> Sump Manufacturer Fiberglass Bravo Bravo Bravo <br /> Sump Depth (inches) 58 inches 8 inches 8 inches 8 inches <br /> Sump Bottom to Top of 22 inches 0 inches 0 inches 0 inches <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 7:OOam 7:15am 7:15am 8:OOam <br /> Initial Reading 1St Ring 1St Ring 1St Ring 1St Ring <br /> Test End Time 7:30am 7:45am 7:45am 8:30am <br /> Final Reading 1St Ring 1St Ring 1St Ring 1St Ring <br /> Change in Reading 0 Change 0 Change 0 Change 0 Change <br /> Pass Fail Criteria 0.05 in 30 min. 0.05 in 30 min. 0.05 in 30 min. 0.05 in 30 min. <br /> Tightness Test Results ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.