Laserfiche WebLink
• <br /> Applied GeoSystems 4191-E Power Inn Road, Sacramento, CA 95826 (916) 452-2901 <br /> • FREMONT • IRVINE • HOUSTON • BOSTON • SACRAMENTO • CULVER CITY • SAN JOSE <br /> May 31, 1989 <br /> AGS 39048-1S <br /> SITE SAFETY PLAN <br /> SUBSURFACE ENVIRONMENTAL INVESTIGATION <br /> City of Stockton <br /> Waterfront Redevelopment Property <br /> West Weber Avenue and North Lincoln Street <br /> Stockton, California <br /> INTRODUCTION <br /> This Site Safety Plan delineates the basic safety requirements for the subsurface <br /> environmental investigation project at the City of Stockton's Waterfront Redevelopment <br /> Property, located at West Weber Avenue and North Lincoln Street, Stockton, California. <br /> The provisions set forth in this Plan will apply to the employees of Applied GeoSystems and <br /> its subcontractors working on this phase of the project. The subcontractors may elect to <br /> modify these provisions, but only to upgrade or increase the safety requirements, and only <br /> with the concurrence of Applied GeoSystems, as designated and accepted in writing. <br /> This Site Safety Plan will address the expected potential hazards that may be encountered <br /> for this project. Field activities are planned to begin within two weeks after approval from <br /> the San Joaquin Local Health District, with the duration estimated at approximately 2 <br /> weeks after the start date. If changes in site or working conditions occur as the activities <br /> progress, addenda to this plan will be provided by Applied GeoSystems. <br /> AUTHORITY FOR SITE SAFETY <br /> Applied GeoSystems personnel responsible for the project safety are the Project Manager <br /> and the Staff Geologist. The Health and Safety Coordinator is responsible for the overall <br /> Health and Safety Program of Applied GeoSystems and may choose to audit any site for <br /> compliance and take appropriate action to correct deficiencies. The Project Manager is <br /> responsible for implementing the provisions of this Plan and providing a copy of this Plan <br /> to the Staff Geologist and advising the Project Staff Geologist on health and safety matters. <br /> The Project Manager and Staff Geologist have the authority to audit site activities for <br /> compliance with the provisions of this Plan and may suspend or modify work practices or <br /> dismiss subcontractors whose conduct does not meet the requirements specified in this Plan. <br />