Laserfiche WebLink
SITE SAFETY PLAN May 31, 1989 <br /> Waterfront Redevelopment, Stockton, California AGS 39048-1 <br /> The Staff Geologist is responsible for the dissemination of the information contained in this <br /> Plan to Applied GeoSystems personnel assigned to the project and to the responsible <br /> representative of each subcontractor firm working under Applied GeoSystems on the <br /> project. The Staff Geologist will also act as the Site Safety Officer. As such, the Staff <br /> Geologist is responsible for adequately addressing the following items: <br /> o Safety supplies and equipment inventory onsite <br /> o Training programs and hazard communication <br /> o Procedures for reporting accidents or incidents <br /> o Decontamination and contamination-reduction procedures <br /> The Staff Geologist has the authority to suspend work anytime he or she finds that the <br /> provisions of the Plan are inadequate for worker safety. The Staff Geologist will promptly <br /> inform the Project Manager and the Health and Safety Coordinator of any deficiency within <br /> the Plan or individuals or subcontractors whose conduct is not consistent with the <br /> requirements of this Plan. <br /> MEDICAL SURVEILLANCE <br /> Applied GeoSystems personnel and subcontractors engaged in project activities must be <br /> participants in a medical surveillance program and must be cleared by the examining <br /> physician(s) to wear respiratory protection devices and protective clothing for working with <br /> hazardous materials. The applicable requirements under Title 8, Section 5216, of the <br /> California Administrative Code will be observed. The applicable requirements under <br /> 29 CFR 1910.120 of the Federal Administrative Code will also be observed. <br /> SAFETY AND ORIENTATION MEETING <br /> Field personnel from Applied GeoSystems and its subcontractors will attend a project- <br /> specific training meeting for safety issues and review the project tasks before beginning <br /> work. The meeting will be led by the Staff Geologist. In addition, fit-testing of respiratory <br /> protective devices will be conducted as part of the safety orientation meeting when the use <br /> of a respirator may be required. <br /> HAZARD ASSESSMENT <br /> The possible major contaminants expected to be encountered on the project are diesel fuel <br /> and gasoline and its hydrocarbon constituents. The anticipated contaminants and their <br /> exposure standards are listed in Table 1. It is not anticipated that the potential levels of <br /> exposure will reach the permissible exposure limits (PELs) or threshold limit values (TLVs). <br /> 7 <br /> 2 <br /> A, pl ed GeoSystems <br />