Laserfiche WebLink
Stante lancho Cordova Office Stantec Const"';ng Corporation <br /> ,3017 Kilgore Road Stantec Company Contact(s)for Inv00%;e: PROJECT No; DATE: <br /> Rancho Cordova, CA Dan Schreiner, Stantec Project Manager PAGE: ' <br /> 1.7 <br /> email-anthony.giglini@stantec.com cc: 211602384.500.0802 <br /> TEL:(916)861-0400 FAX: (916)861-0430 alejandra.hernandez@stantec.com <br /> �OF <br /> Project Name: <br /> 4Q12 Monitoring and Sampling Event Sampler(s):Printed me Lab <br /> Address: <br /> ANALYTICAL <br /> Parcel#2A SAMPLER(S):(SIGNA tFF <br /> I <br /> LAB USE ONLY <br /> W.Weber at N. Lincoln, Stockton, CA / , ❑ ❑_j�J 1:1 El <br /> TURNAROUND TIME(BUSINESS DAYS) <br /> ❑ 10 DAYS F_71 DAYS ❑ 72 HR ❑ 48 HR ❑ 24 HR ❑ <24 HR REQUESTED ANALYSIS <br /> 5-Day(Standard TAT) m <br /> N � <br /> O <br /> O <br /> SPECIAL INSTRUCTIONS OR NOTES: TEMPERATURE ON RECEIPT(C) E <br /> N <br /> CL <br /> Cf <br /> a a o <br /> EDF Deliverable. Please use the following reporting limits: a <br /> t fO <br /> o 0 <br /> TPHg,TPHd,TPH motor oil-50 µg/L; BTEX, MtBE-0.5 4g/L; TBA-200 µg/L. E <br /> w a <br /> LAtS m Iz <br /> USE Field Sample Identification SAMPLING MAT-RIX coprr PRE-SERVE CM <br /> x r <br /> ONLY DATE TIME F H � <br /> QCEB-1-PV iz 0-7e-oc Water 6 HCI X X 3 2- <br /> QCEB-2-PV c - ,Z 0710 Water 6 HCI X X 33 <br /> -VVa er <br /> Relinquished b :( nal Received by:(Signature Time. <br /> Relinquis (Signa e) Received,W.(Si Time: <br /> Relinquished by:(Si lure) Received by:(Signature) p Time: <br /> v <br /> W <br />