Laserfiche WebLink
Stantr 'tancho Cordova Office Stantec Const,'`;ng Corporation `16v <br /> 3017 Kilgore Road Stantec Company Contact(s)for Invor.:e: PROJECT No DATE: <br /> Rancho Cordova, CA Dan Schreiner, Stantec Project Manager �) <br /> PAGE: <br /> email-anthony.giglini@stantec.com 211602384.500.0802 <br /> TEL: (916)861-0400 FAX: (916)861-0430 cc:alejandra.hernandez@stantec.com ��T <br /> OF <br /> Project Name: <br /> 4Q12 Monitoring and Sampling Event Sampler(s):Prin me Lab <br /> Address: <br /> IFF ANALYTICAL <br /> Parcel#2A SAMPLER(S):(SIGNATURE),,' <br /> LABS pNLy <br /> W.Weber at N. Lincoln, Stockton, CA ❑❑ .❑❑❑❑ <br /> TURNAROUND TIME(BUSINESS DAYS) i—J <br /> 010 DAYS DAYS ❑ 72 HR ❑ 48 HR ❑ 24 HR ❑ <24 HR <br /> REQUESTED ANALYSIS <br /> 5-Day(Standard TAT) o <br /> N � <br /> C <br /> 0 L <br /> SPECIAL INSTRUCTIONS OR NOTES: TEMPERATURE ON RECEIPT(C) r °' <br /> N <br /> CLd <br /> EDF Deliverable. Please use the following reporting limits: a a <br /> m •� o <br /> W O O <br /> TPHg, TPHd, TPH motor oil-50 µg/L; BTEX, MtBE -0.5 Itg/L;TBA-200 µg/L. E <br /> W a <br /> m t g <br /> use Field Sample Identification SAMPLING MAT-RIX coNTE PRESERVE d Sao t <br /> SN1LY.' D TE TIME F r c> <br /> O <br /> QCEB-1-RM dv Water 6 HCI X X j 4 <br /> QCEB-2-RM Water 6 HCI X X S <br /> a er HCI <br /> Relinquished by:(Signature) _.— Received by:(Si re Time: <br /> /G <br /> v <br /> Relinquished b nat nq Y:( ) Received by: Si r Time: _ <br /> D- 7-12- 1� <br /> v Relinquis :(Si a Received by:(Signature) ` Time: <br /> N <br /> o - Com* 1- l�l' _t`2 <br /> 0 <br /> W <br />