My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WHISKEY SLOUGH
>
3900
>
2900 - Site Mitigation Program
>
PR0506738
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2021 4:12:26 PM
Creation date
5/20/2021 3:19:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506738
PE
2960
FACILITY_ID
FA0007603
FACILITY_NAME
DEPAOLI DISPOSAL SITE
STREET_NUMBER
3900
STREET_NAME
WHISKEY SLOUGH
STREET_TYPE
RD
City
HOLT
Zip
95234
APN
13109022
CURRENT_STATUS
01
SITE_LOCATION
3900 WHISKEY SLOUGH RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J <br /> GENESIS ENGINEERING&REDEVELOPMENT <br /> 1.0 INTRODUCTION <br /> This Sampling and Analysis Plan ("SAP") covers the work associated with the Site Investigation <br /> Work Plan for the DePaoli Property located in Holt, California("Site"). Genesis Engineering& <br /> Redevelopment, LLC ("GE&R")will implement this SAP in conjunction with the Site <br /> Investigation Work Plan and supporting documents; including the Quality Assurance Project <br /> Plan (Appendix C of the Site Investigation Work Plan) and the Health and Safety Plan <br /> (Appendix D of the Site Investigation Work Plan). Data Quality Objectives for this Project are <br /> provided in the Quality Assurance Project Plan ("QAPP"). This SAP contains a discussion of <br /> the field and laboratory activities associated with the planned Site Investigation Work Plan. <br /> Information on the specific sampling locations, sample matrices, and the number of samples is <br /> provided in the Site Investigation Work Plan. <br /> 2.0 FIELD PROGRAM <br /> 2.1 Field Activities Summary <br /> The general Tasks associated with implementation of the Site Investigation Work Plan include: <br /> 1. Native Soil Investigation <br /> Investigate potential impacts to native soils beneath the drilling mud; advance 24 <br /> borings (DP-1 through DP-24) at the locations shown on Figure B-1 and collect 3 soil <br /> samples from each boring—at 1 foot below the drilling mud, 3 feet below the drilling <br /> �D mud, and in the vadose zone immediately above the shallow water bearing unit; <br /> record soil lithology for each boring; analyze the soil samples for the constituents <br /> listed in Section 3.1. <br /> 2. Drilling Mud Investigation <br /> Investigate the mobility of the diesel range petroleum hydrocarbons in the Disposal <br /> Site through analysis of the length of the hydrocarbon chains. The same 24 borings <br /> used to collect the native soil samples will be used to collect the drilling mud samples <br /> (Figure B-1). One composite drilling mud sample will be collected from each boring. <br /> The sample will be collected as a four-foot section of core taken from the <br /> approximate center of the distance between the top and bottom of the drilling mud. <br /> The composite drilling mud samples will be analyzed for the constituents listed in <br /> Section 3.2. <br /> Sampling and Analysis Plan 1 of 24 <br /> DePaoli Property <br /> November 14,2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.