G= <br /> GENESIS ENGINEERING & REDEVELOPMENT <br /> Metal markers will be placed at the locations where the samples are collected. A <br /> minimum of three samples will be collected across the Site; additional samples will be <br /> collected if active runoff patterns are identified. <br /> The field investigation will take 1 to 2 days to complete. Samples will be submitted to <br /> the selected analytical laboratory for the specified analyses on the daily collected. It will <br /> typically take approximately 2 to 3 weeks to complete the laboratory analyses. Upon <br /> receipt of the finalized laboratory reports, the data will be reviewed, validated, and <br /> uploaded into the site database. <br /> Phase VI <br /> The initial CPT work associated with Task 6 (Installation of the Piezometer Cluster)will <br /> occur during Phase I. Pre-field activities (final research activities,permitting, verifying <br /> and marking boring locations, and clearing proposed boring locations for utilities and <br /> underground obstructions),will take up to two weeks to complete. Simultaneously <br /> during that period,negotiations and contract administration activities will commence for <br /> securing the services of a drilling contractor and analytical laboratory, and a preliminary <br /> field schedule will be developed based on coordination of schedules. Installation of the <br /> piezometer cluster will take 2 to 3 days to complete. <br /> Data Analysis and Reporting <br /> A report summarizing the findings of this Work Plan will be submitted to the RWQCB <br /> approximately 6 weeks after receipt of the finalized laboratory reports. <br /> Site Investigation Work Plan 17 of 18 <br /> DePaoli Property <br /> November 14,2007 <br />