My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WHISKEY SLOUGH
>
3900
>
2900 - Site Mitigation Program
>
PR0506738
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2021 4:12:26 PM
Creation date
5/20/2021 3:19:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506738
PE
2960
FACILITY_ID
FA0007603
FACILITY_NAME
DEPAOLI DISPOSAL SITE
STREET_NUMBER
3900
STREET_NAME
WHISKEY SLOUGH
STREET_TYPE
RD
City
HOLT
Zip
95234
APN
13109022
CURRENT_STATUS
01
SITE_LOCATION
3900 WHISKEY SLOUGH RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G= <br /> GENESIS ENGINEERING & REDEVELOPMENT <br /> Metal markers will be placed at the locations where the samples are collected. A <br /> minimum of three samples will be collected across the Site; additional samples will be <br /> collected if active runoff patterns are identified. <br /> The field investigation will take 1 to 2 days to complete. Samples will be submitted to <br /> the selected analytical laboratory for the specified analyses on the daily collected. It will <br /> typically take approximately 2 to 3 weeks to complete the laboratory analyses. Upon <br /> receipt of the finalized laboratory reports, the data will be reviewed, validated, and <br /> uploaded into the site database. <br /> Phase VI <br /> The initial CPT work associated with Task 6 (Installation of the Piezometer Cluster)will <br /> occur during Phase I. Pre-field activities (final research activities,permitting, verifying <br /> and marking boring locations, and clearing proposed boring locations for utilities and <br /> underground obstructions),will take up to two weeks to complete. Simultaneously <br /> during that period,negotiations and contract administration activities will commence for <br /> securing the services of a drilling contractor and analytical laboratory, and a preliminary <br /> field schedule will be developed based on coordination of schedules. Installation of the <br /> piezometer cluster will take 2 to 3 days to complete. <br /> Data Analysis and Reporting <br /> A report summarizing the findings of this Work Plan will be submitted to the RWQCB <br /> approximately 6 weeks after receipt of the finalized laboratory reports. <br /> Site Investigation Work Plan 17 of 18 <br /> DePaoli Property <br /> November 14,2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.