My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WHISKEY SLOUGH
>
3900
>
2900 - Site Mitigation Program
>
PR0506738
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2021 4:12:26 PM
Creation date
5/20/2021 3:19:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506738
PE
2960
FACILITY_ID
FA0007603
FACILITY_NAME
DEPAOLI DISPOSAL SITE
STREET_NUMBER
3900
STREET_NAME
WHISKEY SLOUGH
STREET_TYPE
RD
City
HOLT
Zip
95234
APN
13109022
CURRENT_STATUS
01
SITE_LOCATION
3900 WHISKEY SLOUGH RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> GENESIS ENGINEERING&REDEVELOPMENT <br /> characterization and disposal. It is anticipated that most of the support facilities will be <br /> located near the southern end of the Site. <br /> 2.2.4 Security <br /> Site access will be controlled with barricade tape and notices depending on site-specific <br /> conditions. Entrance into work area will be restricted to specific points that will be <br /> controlled and monitored by project personnel. Only project personnel, subcontractor <br /> personnel and authorized visitors with proper identification and health and safety training <br /> will be allowed to access to the Site. <br /> It is anticipated that the various phases of well destruction activity will be completed <br /> according to a daily schedule such that no drilling rigs or open boreholes will be left <br /> overnight in area accessible to the general public. <br /> 2.3 Well Destruction <br /> The well destruction procedures outlined in the Work Plan will be followed to abandon <br /> each well in place by placing the sealing material directly into the well casing. Prior to <br /> well destruction activities, the interior of the well casing will be first cleared to eliminate <br /> any obstructions,which might interfere with the effective sealing procedures. Because <br /> the integrity of the well seal is unknown each casing will be perforated upward beginning <br /> just above the fill material to the surface. The open will well subsequently be filled a <br /> County approved sealing material. <br /> The sealing material will consist of a neat cement grout. The wells will be filled with a <br /> sufficient volume of cement grout to completely fill the well casing and force grout <br /> through the perforated holes and into the surrounding lithologic formation to form a <br /> barrier to the vertical movement of water. The wells will be filled from the bottom up <br /> using a tremie pipe to prevent dilution of the grout, ovoid bridging, and ensure proper <br /> grout placement. <br /> The well bores will be filled to within five feet below the ground surface. The total <br /> amount of grout used to seal each well will be recorded. For the protection of the seal a <br /> hole 1.5 feet greater in diameter than hole originally drilled hole will be excavated around <br /> the outside of each well casing to a depth of 5 feet below ground surface. The well <br /> casing will be cut off six (6) inches below this excavation and removed. During the <br /> sealing activities, the grout used to fill the well will be allowed to spill over into the <br /> excavation and fill it for a thickness of one (1) foot to form a cap that has a diameter of at <br /> Monitoring Well Destruction Work Plan 5 of 8 <br /> DePaoli Property <br /> November 14,2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.