My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WHISKEY SLOUGH
>
3900
>
2900 - Site Mitigation Program
>
PR0506738
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2021 4:12:26 PM
Creation date
5/20/2021 3:19:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506738
PE
2960
FACILITY_ID
FA0007603
FACILITY_NAME
DEPAOLI DISPOSAL SITE
STREET_NUMBER
3900
STREET_NAME
WHISKEY SLOUGH
STREET_TYPE
RD
City
HOLT
Zip
95234
APN
13109022
CURRENT_STATUS
01
SITE_LOCATION
3900 WHISKEY SLOUGH RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENESIS ENGINEERING&REDEVELOPMENT <br /> 3. Decontamination solutions will be accumulated and containerized in U.S. <br /> DOT 17H-rated drums, or equivalent, for further characterization and <br /> disposal. Drums will be stored on 'he Site pending receipt of laboratory <br /> results and landfill acceptance. <br /> In addition, any item or vehicle brought onsite will be carefully inspected and cleaned to <br /> remove soil and/or vegetation before leaving the site. <br /> Prior to leaving the Site, all personnel, subcontractors, and/or visitors will remove PPE <br /> that may be contaminated. <br /> 4.0 Deliverable <br /> The deliverable for this project will be a Well Destruction Report, which will include a <br /> description of the work performed and a summary of the well destructions details and <br /> documentation. <br /> 5.0 Implementation Schedule <br /> Upon approval of the Site Investigation Work Plan by the RWQCB, activities associated <br /> with the Monitoring Well Destruction Work Plan will commence. Based on the need to <br /> secure County permits, it may take two to three weeks to complete this Task. <br /> Simultaneously during that period,negotiations and contract administration activities will <br /> commence for securing the services of a drilling contractor and analytical laboratory, and <br /> a preliminary field schedule will be developed based on coordination of schedules. It is <br /> anticipated that the field investigation can commence approximately five to six weeks <br /> following approval of the Site Investigation Work Plan. <br /> The well destruction activities will take approximately three days to complete, depending <br /> on subsurface conditions encountered. IDW samples will be submitted to the analytical <br /> laboratory for waste characterization purposes. It will typically take approximately two <br /> to three weeks to complete the laboratory analyses. Upon receipt of the finalized <br /> laboratory reports, the data will be reviewed, validated, and appropriate waste disposal <br /> practices will be implemented. <br /> The report summarizing the monitoring well destruction activities will be submitted to <br /> Isola &Ruiz, LLP and the RWQCB approximately four weeks after receipt of the <br /> finalized laboratory reports. <br /> Monitoring Well Destruction Work Plan 8 Of 8 <br /> DePaoli Property <br /> November 14,2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.