My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WHISKEY SLOUGH
>
3900
>
2900 - Site Mitigation Program
>
PR0506738
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2021 4:12:26 PM
Creation date
5/20/2021 3:19:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506738
PE
2960
FACILITY_ID
FA0007603
FACILITY_NAME
DEPAOLI DISPOSAL SITE
STREET_NUMBER
3900
STREET_NAME
WHISKEY SLOUGH
STREET_TYPE
RD
City
HOLT
Zip
95234
APN
13109022
CURRENT_STATUS
01
SITE_LOCATION
3900 WHISKEY SLOUGH RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENESIS ENGINEERING& REDEVELOPMENT <br /> • Advancement of exploratory borings and collection of samples for <br /> characterization of subsurface soil, drilling mud, and groundwater <br /> • Installation of Groundwater Monitoring Wells <br /> • Installation of a piezometer cluster for determining the vertical gradient between <br /> the upper most water bearing units <br /> GE&R personnel will observe field activities. All subcontractors shall be required to develop <br /> and follow their own site specific HASP. The subcontractors are also responsible for following <br /> all federal, state, and local requirements applicable to their operations. Upon request, <br /> subcontractors shall provide GE&R with a copy of their HASP, documentation of training, <br /> medical surveillance program participation, respirator fit-test records, and workers compensation <br /> insurance for all personnel conducting field activities. <br /> 2.0 PROJECT SAFETY AUTHORITY <br /> The following personnel are responsible for Project Health and Safety for GE&R personnel only <br /> under the HASP: <br /> • Project Manager <br /> • Field Team Leader <br /> • Corporate Health and Safety Officer <br /> In addition, each GE&R staff member working at the Site will be responsible for compliance <br /> with the health and safety procedures established herein as well as conformance with general <br /> safe work practices. <br /> 2.1 Project Manager <br /> The Project Manager is responsible for day-to-day Project activities. The Project Manager may <br /> also act as the Health and Safety Manager on smaller projects, where appropriate. In addition, <br /> the Project Manager is responsible for the implementation of the HASP, as well as conformance <br /> with general safe work practices. <br /> 2.2 Field Team Leader <br /> The Field Team Leader is responsible for disseminating the information contained in the HASP <br /> to GE&R staff assigned to the Project. The Field Team Leader may act as the Health and Safety <br /> Manager on smaller projects, where appropriate. The Field Team Leader will have a minimum <br /> of 40 hours initial training, three days of supervised field experience, and at least eight hours of <br /> Health and Safety Plan 2 of 16 <br /> DePaoli Property <br /> November 14,2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.