My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2003-2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
CORRESPONDENCE_2003-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2021 10:58:50 AM
Creation date
5/21/2021 8:59:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2003-2004
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PpUIN ..i <br /> THOMAS R. FLINN P.O.BOX 1810-1810 E. HAZELTON AVENUE <br /> DIRECTOR (209)STOCKTON,CALIFORNIA 95201 <br /> (209)468-3000 FAX(209)468-2999 <br /> C4C/FORtY www.co.san-joaquin.ca.us <br /> THOMAS M.GAU +� , <br /> DEPUTY DIRECTOR v <br /> MANUEL SOLORIO Worldng for YOU <br /> DEPUTY DIRECTOR <br /> STEVEN WINKLER <br /> DEPUTY DIRECTOR <br /> BENTON ANGOVE F E 2 °7 2003 <br /> BUSINESS ADMINISTRATOR <br /> PFR'Mi;T/I ERVIGES <br /> February 26, 2003 <br /> MEMORANDUM <br /> TO: Robert McClellon, REHS <br /> Environmental Health Department <br /> FROM: W. Michael Carroll, PE <br /> Senior Civil Engineer <br /> SUBJECT: WORKPLAN TO CORRECT PONDING ON THE TOP COVER OF <br /> HARNEY LANE LANDFILL <br /> The following workplan to correct ponding on the top surface of the Harney Lane Sanitary <br /> Landfill is submitted to comply with the inspection report from the San Joaquin County <br /> Environmental Health Department. The objective of this work is to comply with <br /> Section 21090(b)(1)(A) of Title 27, California Code of Regulations, and thus prevent ponding. <br /> This work will not involve any modification or penetration of the final cover's low-hydraulic- <br /> conductivity layer. Therefore, the County is not submitting a Construction Quality Assurance <br /> plan, per Title 27, Section 21090(b)(1)(E). <br /> Project Description <br /> The primary work of this project will be compacting the entire top surface of the landfill (see <br /> attached drawing). Compacting the top surface will include: <br /> • Removing the vegetative material. <br /> • Compacting the surface. <br /> • Placing additional soil and smoothing as needed. <br /> • Hydroseeding the finished surface. <br />
The URL can be used to link to this page
Your browser does not support the video tag.