Laserfiche WebLink
PW 0 0 <br /> In addition, the construction work will also include: <br /> • Constructing cross slope berms to assist in directing surface water run off into <br /> existing drop inlets. <br /> • Installing new down drains as necessary. <br /> • Relocating the main access road. <br /> • Other minor road improvements. <br /> Borrow Source <br /> The County intends to use the soils from the Harney Lane Landfill borrow area(see attached <br /> drawing) for use on this project. The County will explore the soils available at Harney Lane to <br /> determine if sufficient material meeting the size criteria(30% passing#200 sieve) is available on <br /> site. If sufficient material is not available, it will be imported from the stockpile at the <br /> North County Landfill. The soils at the North County Landfill have been documented to meet <br /> this criteria. <br /> Construction Schedule <br /> Construction is tentatively scheduled to begin in June 2003, and be complete by mid August 2003. <br /> A complete set of Plans and Specifications will be sent to the Environmental Health Department <br /> for your records once they are complete. <br /> If you have any questions, please call me at 468-3066. <br /> WMC:kf <br /> N:\1Harney Lane\CoverRegrade03\RMeClellon0l-Workplan Memo.wpd <br /> Enclosures <br /> c: Kim Schwab, CVRWQCB <br /> 3443 Routier Road <br /> Sacramento, California 95827 <br /> LA 11103 <br />