My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2008-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
CORRESPONDENCE_2008-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2021 11:39:55 AM
Creation date
5/25/2021 11:23:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2008-2009
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Potential hazards associated with LFG are due to: <br /> 1. Oxygen defiance in the landfill gas <br /> 5. Combustible characteristics of landfill gas <br /> 6. Potential for hydrogen sulfide in LFG <br /> Potential hazards include: <br /> a. Fire <br /> b. Explosion <br /> c. Asphyxiation <br /> 1.03 RESPONSIBILITY FOR SAFETY <br /> The Contractor is solely and wholly responsible for the safety of his workers <br /> and damage to his equipment. Contractor shall follow OSHA safety <br /> standards. <br /> The Contractor shall submit proof of current general liability and worker's <br /> compensation insurance to the County before commencing work. <br /> 1.04 USE OF SITE <br /> A. The working hours shall be Monday to Friday from 8:00 am to 5:00 pm <br /> excluding public holidays. <br /> B. The landfill's perimeter is gated to prevent illegal dumping and trespassing. <br /> Engineer will provide the Contractor the main entrance gate key of the <br /> landfill. The Contractor shall keep the main entrance gate closed during <br /> working hours and locked at the end of each working day. <br /> C. Contractor shall place debris and refuse from contractor's operations in a <br /> disposal dumpster. The dumpster shall be covered at all times and its <br /> contents disposed at North County Landfill when full. The Contractor shall <br /> pay all disposal fees. <br /> D. Water for well construction is available on site. The Engineer will <br /> demonstrate the operation of the well pump. However, the Contractor shall <br /> bring drill rig's water tank full on the first day. <br /> Construction Specifications San Joaquin County <br /> Dual LFG Extraction Wells Public Works Department <br /> Harney Lane Sanitary Landfill Page 2 of 13 Solid Waste Division <br /> Revised 11-18-09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.