Laserfiche WebLink
0 10 <br /> backfilling the borehole as shown on the construction drawings, final <br /> grade restoration and hauling refuse and soil mixed with refuse off site. <br /> PART 5 DEFINITIONS AND TERMS <br /> 5.01 DEFINITIONS <br /> County —County shall mean the County of San Joaquin, Department of <br /> Public Works, Solid Waste Division. <br /> Engineer- Shall mean Staff Engineer of San Joaquin County, Department of <br /> Public Works, Solid Waste Division. <br /> EHD- Shall mean San Joaquin County Environmental Health Department. <br /> END OF SECTION <br /> Construction Specifications San Joaquin County <br /> Dual LFG Extraction Wells Public Works Department <br /> Harney Lane Sanitary Landfill Page 13 of 13 Solid Waste Division <br /> Revised 11-18-09 <br />