Laserfiche WebLink
Payment for valve box installation shall be by the unit price quoted in the <br /> cost sheet. The unit price quoted shall include full compensation for <br /> furnishing all labor, tools and equipment for <br /> • Splitting the main 3" lateral into two laterals, 3" and 2" laterals, by <br /> installing the wye and other fittings as shown on the construction <br /> drawings. <br /> • Installing: <br /> a. Gate valves with flanges on the split 3" and 2" lateral. <br /> b. Valve box and labeling the valve box lid per well number. <br /> c. Valve tags provided by the County. <br /> d. Monitoring stopcock valves on each side of each lateral's gate <br /> valve. <br /> • Doing all the work as shown on the construction drawings and specified <br /> here-in. <br /> 4.07 ABANDONED BORINGS <br /> A. Measurement <br /> 1. Measurement for abandoned boring backfill in refuse and abandoned <br /> boring backfill in native soil shall be by the linear foot (Figure 9). <br /> 2. Contractor shall measure the depth of abandoned boring from ground <br /> surface to the bottom with a weighted measuring tape in the presence <br /> of the Engineer. The Contractor shall then calculate the depth of <br /> backfill in refuse and depth of backfill in native soil. Abandoned boring <br /> depth calculations shall be verified with the Engineer. <br /> B. Payment <br /> 1. Payment for abandoned boring backfill in refuse and native soil shall <br /> be by the unit price per linear foot quoted in the cost sheet. <br /> 2. Payment for abandoned boring backfill in native soil shall be by the <br /> unit price per linear foot quoted in the cost sheet. <br /> 3. The unit price quoted for each backfill section shall include full <br /> compensation for furnishing all labor, tools, equipment for drilling, <br /> Construction Specifications San Joaquin County <br /> Dual LFG Extraction Wells Public Works Department <br /> Harney Lane Sanitary Landfill Page 12 of 13 Solid Waste Division <br /> Revised 11-18-09 <br />