My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1460
>
2900 - Site Mitigation Program
>
PR0515018
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2021 6:48:09 PM
Creation date
5/26/2021 1:37:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0515018
PE
2950
FACILITY_ID
FA0012010
FACILITY_NAME
TRADEWAY CHEVROLET/AUTOBODY
STREET_NUMBER
1460
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1460 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
k" KLEIN FELDER <br /> B-4.2 Groundwater Sampling <br /> Groundwater samples are collected from the monitoring wells at the site. The sampling protocol <br /> for each well is as follows: <br /> 1. Down-well equipment (pumps, bailers, etc.) is decontaminated by steam cleaning, or by <br /> scrubbing in a trisodium-phosphate or non-phosphate detergent wash followed by a <br /> distilled water rinse, prior to use in each well. Bailer cord is replaced prior to use in each <br /> well. <br /> 2. The depth to groundwater is measured using a conductivity-based water-level meter. <br /> 3. The volume of water in gallons standing in the well is calculated by subtracting the depth <br /> to groundwater measurement from the depth of the well and multiplying by the <br /> appropriate conversion factor(0.16 for 2-inch wells, and 0.65 for 4-inch wells). <br /> 4. Three to five well volumes of water are purged from each well using a submersible <br /> pump, bladder pump, or Teflon bailer. <br /> 5. Physical parameters (pH, electrical conductivity, and temperature) are monitored for <br /> stability while purging. The physical parameter measurements are recorded on purge- <br /> and-sample logs, along with the time and volume of water purged at each measurement. <br /> 6. Samples are collected with a disposable bailer or bladder pump into appropriately <br /> prepared bottles provided by the analytical laboratory. <br /> 7. Samples for metals analysis are usually filtered in the field at the time of collection. <br /> 8. Samples are immediately labeled and placed in an iced sample container. At the end of the <br /> day, the samples are delivered to the analytical laboratory under chain-of-custody control. <br /> C20-3978-03.MTG/2002P134 Page B-7 <br /> Copyright 2002,Kleinfelder,Inc. April 29,2002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.