Laserfiche WebLink
k" KLEINFELDER <br /> ATTACHMENT A <br /> SCOPE OF WORK <br /> Additional Soil and Groundwater Investigation <br /> Tradeway Chevrolet <br /> 1460 East Yosemite Avenue <br /> Manteca, California 95336 <br /> 1.0 INTRODUCTION <br /> This proposal was developed after discussion with Mr. Bing Kirk of AKF Development, LLC, <br /> and is a preliminary understanding of AKF Development's desires. This proposal was based on <br /> information usually requested in a workplan by the San Joaquin County Public Health Services <br /> Department Environmental Health Division (PHS/EHD) and the Central Valley Office of the <br /> State of California Regional Water Quality Control Board (CVRWQCB). <br /> Kleinfelder is committed to providing quality service to its clients, commensurate with their <br /> wants, needs and desired level of risk. If a portion of this proposal does not meet the needs of <br /> AKF Development, or if those needs have changed, Kleinfelder will consider appropriate <br /> modifications, subject to the standards of care to which we adhere as professionals. <br /> Modifications such as changes in scope, methodology, scheduling, and contract terms may result <br /> in changes to the risks assumed by AKF Development as well as adjustments to our fees. <br /> 2.0 SCOPE OF WORK <br /> 2.1 Permitting and Pre-Field Activities <br /> It has been Kleinfelder's experience that this proposal contains sufficient detail and information to <br /> be submitted to San Joaquin County Public Health Services Department Environmental Health <br /> Division (PHS/EHD) to review and approve a boring/well permit. Kleinfelder can prepare a <br /> boring/well permit application, a proposed boring/well location map, and a health and safety plan <br /> for submittal along with this proposal to PHS/EHD. Additionally, the permits must be approved <br /> prior to drilling the borings. Following obtaining approval from the PHS/EHD, Kleinfelder will <br /> commence with the actual assessment. Please note that Kleinfelder can not commence with the <br /> actual field work until the proposed scope of work and the PHS/EHD permit have been <br /> approved. Additionally, PHS/EHD will bill AKF Development for their time spent on the <br /> proj ect. <br /> 2.2 Drilling of Three Soil Borings and Monitoring Well Installation <br /> Three (3) soil borings will be advanced to a maximum depth of approximately 30 feet below <br /> ground surface (bgs). The four borings will be drilled approximately 10 to 15 feet into <br /> groundwater.Monitoring wells will be constructed in each boring. <br /> C20-3978-03.MTG/2002P134 Page 1 of 6 <br /> Copyright 2002,Kleinfelder,Inc. April 29,2002 <br />