Laserfiche WebLink
k'q KLEINFELDER <br /> 3.0 PROJECT SCHEDULE <br /> The proposed scope of work would be performed in accordance with the following approximate <br /> schedule. <br /> Approximate Task <br /> Timeline <br /> Week 0 Formal authorization provided by the client <br /> Week 0 - 4 PHS/EHD Permitting ' <br /> Week 5 Field Work <br /> Week 6 - 7 Chemical Analysis and Topographic Survey <br /> Week 7 - 8 Phase II ESA Report Preparation <br /> Week 9 Phase II ESA Report submitted to the client <br /> Kleinfelder has no control over the time required by a regulatory agency to review and approve a work plan and <br /> permit applications. Kleinfelder will make efforts to expedite their services. <br /> Z This work would be done by a subcontractor. Kleinfelder selects reputable subcontractors, but, does not have <br /> full control over the time required by said companies. Kleinfelder will make efforts to expedite their services. <br /> 4.0 CLIENT RESPONSIBILITIES AND ASSUMPTIONS <br /> This proposal and the attached cost estimate are based on the following assumptions and <br /> responsibilities: <br /> • AKF Development will assist Kleinfelder in obtaining access to the site and owner <br /> authorization for the proposed sampling. <br /> • Adequate work space and access will be provided. Kleinfelder will attempt to advance <br /> soil borings and collect samples at the proposed locations. If the drilling equipment <br /> cannot be positioned, alternative drilling locations or sampling methods should be <br /> investigated. <br /> The borings are to be drilled with a truck mounted drill rig equipped with hollow stem <br /> augers, or sampled using a hand auger and slide hammer. If difficult drilling conditions <br /> are encountered, alternative sampling methods may be necessary. Soil generated during <br /> the sampling will be used to backfill the hand auger borings. <br /> • Soil and water generated during the drilling and sampling will be the responsibility of the <br /> client. Soil cuttings and decontamination rinseate will be left on site. Sampling and <br /> analysis of the contained soil and water may be necessary prior to disposal. Disposal or <br /> remediation options for the soil and water can be assessed once analytical results have <br /> been received. Kleinfelder is prepared to assist the client and to remediate or dispose of <br /> stockpiled soil and water, if requested, at an additional charge. <br /> • This proposal is based on the presumption that the client will clearly mark utilities and <br /> will provide any and all available survey maps or other data to determine the location of <br /> existing structures, underground utilities and services. AKF Development should be <br /> aware that penetrating the site's surface is inherently risky. it is impossible to determine <br /> C20-3978-03.MTG/2002P134 Page 4 of 6 <br /> Copyright 2002,Kleinfelder,Inc. April 29,2002 <br />