Laserfiche WebLink
GENERAL NOTES: <br /> AIR CONDITIONING LEGEND <br /> 1. LAYOUT OF MATERIALS, EQUIPMENT AND SYSTEMS IS <br /> SYMBOL ITEM ABBR GENERALLY DIAGRAMMATIC UNLESS SPECIFICALLY cn <br /> �--� ROUND DUCT Q DIMENSIONED. SOME WORK MAY BE SHOWN OFFSET FOR 0 <br /> FLAT OVAL DUCT $ CLARITY. THE HVAC BUILDING PLANS HAVE BEEN PREPARED <br /> TO MATCH THE ARCHITECTURAL PLANS. IF DIFFERENCES U <br /> SHEET METAL DUCT - OCCUR, THE ARCHITECTURAL PLANS ARE TO TAKE 0 z <br /> Q <br /> PRECEDENCE. THE ACTUAL LOCATIONS OF ALL MATERIALS, _ a-, <br /> ACOUSTIC LINING FOR (L) PIPING, DUCTWORK, FIXTURES, EQUIPMENT, SUPPORTS, ETC. z o z <br /> DUCT OR GRILLES SHALL BE CAREFULLY PLANNED, PRIOR TO INSTALLATION OF Q O O <br /> 2 1 ANY WORK, TO AVOID ALL INTERFERENCE WITH EACH OTHER, <br /> DUCT W/EXT INSULATION - OR WITH STRUCTURAL, ELECTRICAL, ARCHITECTURAL, OR _ <br /> REFRIGERANT PIPE REFRIGERANT LINE SETS, & GALV. SM SUNSHIELD OTHER ELEMENTS. ALL DUCT AND PIPE OFFSET ELBOWS FOR <br /> 0 <br /> uJ <br /> PORTAL, REF. E/M2.0 REF. SHEET M2.1 SUPPLYAIR DUCT DROP - COORDINATION BETWEEN TRADES ARE NOT SHOWN. N M <br /> LV1 LV1 RETURN AIR DUCT DROP - CONTRACTOR SHALL INCLUDE SUFFICIENT FUNDS FOR THE N C < <br /> 2500 CFM 2500 CFM RGI WITH NCA MODEL XABD-1 COORDINATION OFFSETS IN THE BID. VERIFY THE PROPER <br /> EXHAUST DUCT AIR DROP - VOLTAGE AND PHASE OF ALL EQUIPMENT WITH THE Q 4 <br /> 10'- 0"AFF TO 10'- 0"AFF TO BA KDRAFT DAMPER, TYP. <br /> F 4 <br /> BOTTOM OF LOUVER BOTTOM OF LOUVER SUPPLY AIR DUCT RISE _ ELECTRICAL PLANS. ALL CONFLICTS SHALL BE CALLED TO THE <br /> ( B -- - - - - - - - - _ - - - - - B I - ATTENTION OF THE ARCHITECT AND THE ENGINEER PRIOR TO ❑ ❑ ❑ ❑ <br /> �� �^ -- RETURN AIR DUCT RISE THE INSTALLATION OF ANY WORK OR THE ORDERING OF ANY <br /> - CD4 This document, the ideas and <br /> EXHAUST AIR DUCT RISE EQUIPMENT. <br /> ICE FREEZER r------ ----- I ------ ------ 100CFM — designs incorporated herein, are <br /> ILI <br /> TURNING VANES TV solely the property of VAI and is <br /> 2. WHEN INSTALLING DRILLED-IN ANCHORS AND/ORnot to be used, in whole or in <br /> ------J ----- ------J EXTRACTOR POWDER-DRIVEN PINS IN EXISTING NON-PRESTRESSED part for any project or <br /> 7r7 _ ''-' CONCRETE, USE CARE AND CAUTION TO AVOID CUTTING OR duplication, without written <br /> VOLUME CONTROL DAMPER DAMAGING THE EXISTING REINFORCING BARS. WHEN authorization. <br /> �� S CD1 I I LL___ -S ___ 00 C, W/LOCKING QUADRANT VCD INSTALLING THEM INTO EXISTING PRESTRESSED CONCRETE © COPYRIGHT 2019 <br /> rr� 18"x6" 450 CFM �� I r (PRE- OR POST-TENSIONED), LOCATE THE PRESTRESSED ❑ ❑ ❑ ❑ <br /> ° <br /> \1 V- 6 AFF _ I I � I � OPPOSED BLADE DAMPER OBD <br /> I TENDONS BY USING A NON-DESTRUCTIVE METHOD PRIOR TO <br /> ° I I BACKDRAFT DAMPER BDD INSTALLATION. EXERCISE EXTREME CARE AND CAUTION TO U O N 171- Ln <br /> I I CO,CO,I ( k VOLUME CONTROL DAMPER AVOID CUTTING OR DAMAGING THE TENDONS DURING U [-- <br /> (0)(0)1 � � <br /> TPC- 8 FLE PACK UNIT, UN'ISE I VCR INSTALLATION. MAINTAIN A MINIMUM CLEARANCE OF ONE INCH ,__, � <br /> LEF 2.1 I I , W/REMOTE REGULATOR BETWEEN THE REINFORCEMENT AND THE DRILLED-IN ANCHOR V� � � <br /> I J AND/OR PIN. U <br /> 572 LBS _ CD3 � FIRE/SMOKE DAMPER F/SD 4� � � <br /> (208/3/60- 27.7 MCA, - --_ -- --- 50 CFM WITH ACCESS PANEL U Ln `n <br /> 0 Z J <br /> 35 MOCP I 11 { I & 3. DUCTWORK SIZES SHOWN ARE INSIDE CLEAR DIMENSIONS. (� `� `� <br /> Q) CUBIC FEET OF AIR <br /> WHERE ACOUSTIC LINING IS SHOWN, INCREASE EACH SHEET c� <br /> CD1 L — _ _ — — _ — — CFM CFM U � 4-1 <br /> U v <br /> METAL DIMENSION TO ACCOMMODATE LINING & MAINTAIN .� <br /> 18"x6" 450 CFM PER MINUTE <br /> 11'- 6"AFF TPC-2A FLEXPA U <br /> 6 0 6 CLEAR INSIDE DUCT DIMENSIONS SHOWN. 141 <br /> O <br /> ° UNIT, REF M2.1 M EMS MOTORIZED - <br /> REQUIRED 606 LBS ROUTE 8"EXHAUST DUCT DUCT DAMPER/PIPE 4. SA DUCTWORK SHALL BE 1"PRESSURE CLASS, AND RA & EA C ,� N <br /> WORKING 0CD FM NOTED. <br /> (208/3/60 - 43.4 UP THRU ROOF WITH ROOF VALVE ACTUATOR DUCTWORK SHALL 1 PRESSURE CLASS UNLESS OTHERWISE �Q U Ln <br /> w CLEARANCE, MCA, 60 MOCP - CAP AND INSECT SCREEN, <br /> 18"x6" TYPICAL `,° TYPICAL. O THERMOSTAT @ +4'-0" T'STAT <br /> RTU-2 _ •F__ o TOP OF BOX 5. DUCTS AND PIPING SHALL BE DESIGNED AND INSTALLED TO <br /> 799 LBS CD 12"o ___ MEET THE REQUIREMENTS OF THE CURRENT EDITION OF THE <br /> 20"x14"_ _ _ EMS TEMPERATURE - SMACNA DUCT CONSTRUCTION STANDARDS AND SEISMIC 4� <br /> E <br /> �� -- -- --- SENSOR +4'-0" TOP � <br /> CD1 @ RESTRAINT MANUAL. INSTALLER SHALL HAVE A COPY OF THE <br /> 1 & 450 CFM OFBOXMANUAL ONSITERATTIMEOFINSPECTIONS. WHERE <br /> -- - 11'- 6"AFF 2"� -- -- F4Fm C�2 7 DISCREPANCIES OCCUR IN THE FIELD. INSPECTION WILL HAVE <br /> -- <br /> O �1 (3-WAY) ; J 250 AFM DP EMS DIFFERENTIAL DP JURISDICTION, OR JUSTIFICATION SHALL BE PROVIDED FOR <br /> ' 1 18"x6 JJJ 12'(Q) PRESSURE SENSOR <br /> A <br /> M2.0 6„� (4-WAY) STRUCTURAL REVIEW. 2016 CMC 602.3, 603.3 THRU 303.3.3, <br /> - ��� �--►� DIRECTION OF FLOW - 603.8, SMACNA-HVAC DUCT CONSTRUCTION STANDARDS AND <br /> 11 EF-1 ----- ]� SUPPLYAIR SA SEISMIC RESTRAINT MANUAL, AND CBC. <br /> CD1100 CFM RETURN AIR RA <br /> 350 CFM11 <br /> 18"x6'q! TRANSITION FROM 6. PRIOR TO MECHANICAL PERMIT FINAL, A SMOKE DETECTOR <br /> 0'- 6”AF _--_-_-_� 18"x6" TO 10"x6". �� EXHAUST AIR EA SHUT-OFF TEST WILL BE REQUIRED. COORDINATE TESTING <br /> CD1WITH FIRE PREVENTION. IF THERE IS AN ALARM PRESENT, THE El El El ElRG 1 RTU-1 OUTSIDE AIR OSA SMOKE DETECTORS FOR UNIT SHUT-OFF SHALL BE <br /> 18"x6" 450 CFM 1150 CFM S 6'AFF <br /> 11'- 6"AFF SUPERVISED BY THE FIRE DETECTION OR ALARM SYSTEM AND <br /> � c� PIPE/DUCT TURN DOWN - �1 q <br /> MERCHANDISE 16"o <br /> INSTALLED IN ACCORDANCE WITH NFPA 72. DETECTION OF <br /> _ RGI 12"� I I C �Q PIPE/DUCT TURN UP - <br /> iv I M2.0 SMOKE IN ONE OF THE HVAC SUPPLY DUCT DETECTORS SHALL r w <br /> 1150 CFM I I > <br /> ' �� POINT OF CONNECTION POC SHUT OFF THE POWER SOURCE TO ALL OF THE HVAC UNITS. o _ z <br /> k 16"o �J I' RG- FRESNO FIRE POLICY 407.4 2016 CMC 608.1. I Q " 00 `J z w <br /> cv i _ ;___� JI lI CD2 450 C M EXISTING (DESIGNATED) (E) r,r�' 1 -` I Q- z <br /> I I I , �_ I , w <br /> _ i �, H <br /> cL_' w Q <br /> NEW(DESIGNATED) (N) �\\v+k , _i w <br /> I I __ J I <br /> ' A 1 28' 14" X11' 1 600 CFM BACKROOM <br /> cc' M2.0 i 1 1 120 MI DUCT SMOKE DETECTOR SD <br /> 1 3-WAY <br /> RTU-1 - ---- - �� O1 ( ) 6„� CD-2 CD <br /> 1,173 LBS KEYNOTES. (THIS SHEET ONLY) ❑ ❑ ❑ ❑ <br /> 24"x12" 18 FM 1 ---'- - 100 CFM 400 CFM DIFFUSER OR GRILLE TYPE & CFM <br /> O1 DISCONNECT TYP. REF. <br /> S M2.0 ES ` OS SPACE TEMP. SENSOR S <br /> AD 1\ x 6��o ELECTRICAL SHEET <br /> 200 CFM S H C CD1 ;N <br /> 11 - 6 AFF 350 CFM <br /> „ ' S H C SPACE TEMP. /HUMIDITY/ SHC <br /> RTU-2 "AFF 18 x6 <br /> 8'-6”AFF 0'- 6 CO2 COMBO SENSOR �ED❑ <br /> CD-2 OFFICE �J <br /> ELBOW WITH TURNING VANES <br /> STORAGE - 300 CFM <br /> 10"o _ <br /> ` (3-WAY) CD-3 TEE WITH TURNING VANES El El El El <br /> 1100 CFM <br /> A.1 LL A.1 r p <br /> - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ROUND (OR OVAL) ELBOW V Ln <br /> I ­ I <br /> _J11 <br /> ❑ SUPPLYAIR DIFFUSER WITHz Z <br /> ROUND SUPPLY DUCT U 0 Q <br /> o 0 0 0 0 0 0 o Q 0 J <br /> IL <br /> ( RETURN OR EXHAUST AIR DIFFUSER CD <br /> WITH ROUND DUCT Q z <br /> D ., o w <br /> U <br /> Z Y <br /> U W <br /> UJ UJ <br /> O U <br /> UJ <br /> rn > a> LL <br /> 20 LU�+ LU <br /> W Q <br /> J Q U <br /> ALL THE REFRIGERATION EQUIPMENT SHOWN COMMISSIONING AND T&B REQUIRED AND A REPORT REF EMS1.0 SHEET FOR ADDITIONAL INFORMATION LAY-IN CEILING NOTE: SUPPLYAIR DEVICES SHALL BE OQROFrESSIpO UJ U Q <br /> ON THE PROTO DRAWINGS USE REMOTE GENERATED USING 7-ELEVENS COMMISSIONING REPORT REGARDING THE BUILDING ENERGY MANAGEMENT INDICATED AS 3-WAY AIR DEVICES WHEN LOCATED WITHIN �c�� F,� G4^r F = <br /> CONDENSERS. BCP OPERATORS PLANNING TO TEMPLATE. PROVIDE A COPY TO THE OWNER AND ENGINEER. IF SYSTEM CONTROLS. CONTACT AUTOMATED LOGIC (ALC) A 10'-0"RADIUS OF THE OPEN AIR SANDWICH CASE � 3 y o <br /> W <br /> USE SELF-CONTAINED REFRIGERATION HVAC SYSTEM AIRFLOW CANNOT BE BALANCED PER PLANS, AT(866) 390-4275 UPON AWARD OF CONTRACT TO <br /> EQUIPMENT SHOULD USE APPROPRIATE HEAT CONTACT ENGINEER OF RECORD FOR RESOLUTION. OBTAIN LIST OF CERTIFIED EMS INSTALLERS. DURING / r%ka. ti 2 <br /> LOAD CALCULATIONS TO SIZE THE HVAC UNITS. CONSTRUCTION, AT 2 WEEKS PRIOR TO BUILDING ten. s- 2021 ❑ ❑ ❑ ❑ <br /> THE CUT SHEETS FOR THE SELF-CONTAINED TURNOVER, CONTACT ALC TO COORDINATE DELIVERY s;- �-�, r <br /> REFRIGERATION EQUIPMENT ARE AVAILABLE OF EMS PANEL. AFTER INSTALLATION OF EMS PANEL Ile' OF CAL\FISSUE DATE: 7-30-19 <br /> SEPARATELY. INCLUDING CONNECTION OF CABLES, CONTACT ALC FOR <br /> START-UP OF EMS PANEL. START-UP TO BE DONE 2-3 REV. DATE: 12-20-1q <br /> DAYS PRIOR TO BUILDING TURNOVER. <br /> LAWRENCE PROJECT NO.: 18008.2 <br /> ENGINEERING GROUP DRAWN BY: NL <br /> .0 - REFLECTED CEILING PLAN NORTH (559 N. 1-010aple Ave.,Suite 101 Fresno,43 93720 <br /> -13620�-1 (559) 431-0101 19368 FAX(559)431-1362 SHEET: <br />