GENERAL NOTES:
<br /> AIR CONDITIONING LEGEND
<br /> 1. LAYOUT OF MATERIALS, EQUIPMENT AND SYSTEMS IS
<br /> SYMBOL ITEM ABBR GENERALLY DIAGRAMMATIC UNLESS SPECIFICALLY cn
<br /> �--� ROUND DUCT Q DIMENSIONED. SOME WORK MAY BE SHOWN OFFSET FOR 0
<br /> FLAT OVAL DUCT $ CLARITY. THE HVAC BUILDING PLANS HAVE BEEN PREPARED
<br /> TO MATCH THE ARCHITECTURAL PLANS. IF DIFFERENCES U
<br /> SHEET METAL DUCT - OCCUR, THE ARCHITECTURAL PLANS ARE TO TAKE 0 z
<br /> Q
<br /> PRECEDENCE. THE ACTUAL LOCATIONS OF ALL MATERIALS, _ a-,
<br /> ACOUSTIC LINING FOR (L) PIPING, DUCTWORK, FIXTURES, EQUIPMENT, SUPPORTS, ETC. z o z
<br /> DUCT OR GRILLES SHALL BE CAREFULLY PLANNED, PRIOR TO INSTALLATION OF Q O O
<br /> 2 1 ANY WORK, TO AVOID ALL INTERFERENCE WITH EACH OTHER,
<br /> DUCT W/EXT INSULATION - OR WITH STRUCTURAL, ELECTRICAL, ARCHITECTURAL, OR _
<br /> REFRIGERANT PIPE REFRIGERANT LINE SETS, & GALV. SM SUNSHIELD OTHER ELEMENTS. ALL DUCT AND PIPE OFFSET ELBOWS FOR
<br /> 0
<br /> uJ
<br /> PORTAL, REF. E/M2.0 REF. SHEET M2.1 SUPPLYAIR DUCT DROP - COORDINATION BETWEEN TRADES ARE NOT SHOWN. N M
<br /> LV1 LV1 RETURN AIR DUCT DROP - CONTRACTOR SHALL INCLUDE SUFFICIENT FUNDS FOR THE N C <
<br /> 2500 CFM 2500 CFM RGI WITH NCA MODEL XABD-1 COORDINATION OFFSETS IN THE BID. VERIFY THE PROPER
<br /> EXHAUST DUCT AIR DROP - VOLTAGE AND PHASE OF ALL EQUIPMENT WITH THE Q 4
<br /> 10'- 0"AFF TO 10'- 0"AFF TO BA KDRAFT DAMPER, TYP.
<br /> F 4
<br /> BOTTOM OF LOUVER BOTTOM OF LOUVER SUPPLY AIR DUCT RISE _ ELECTRICAL PLANS. ALL CONFLICTS SHALL BE CALLED TO THE
<br /> ( B -- - - - - - - - - _ - - - - - B I - ATTENTION OF THE ARCHITECT AND THE ENGINEER PRIOR TO ❑ ❑ ❑ ❑
<br /> �� �^ -- RETURN AIR DUCT RISE THE INSTALLATION OF ANY WORK OR THE ORDERING OF ANY
<br /> - CD4 This document, the ideas and
<br /> EXHAUST AIR DUCT RISE EQUIPMENT.
<br /> ICE FREEZER r------ ----- I ------ ------ 100CFM — designs incorporated herein, are
<br /> ILI
<br /> TURNING VANES TV solely the property of VAI and is
<br /> 2. WHEN INSTALLING DRILLED-IN ANCHORS AND/ORnot to be used, in whole or in
<br /> ------J ----- ------J EXTRACTOR POWDER-DRIVEN PINS IN EXISTING NON-PRESTRESSED part for any project or
<br /> 7r7 _ ''-' CONCRETE, USE CARE AND CAUTION TO AVOID CUTTING OR duplication, without written
<br /> VOLUME CONTROL DAMPER DAMAGING THE EXISTING REINFORCING BARS. WHEN authorization.
<br /> �� S CD1 I I LL___ -S ___ 00 C, W/LOCKING QUADRANT VCD INSTALLING THEM INTO EXISTING PRESTRESSED CONCRETE © COPYRIGHT 2019
<br /> rr� 18"x6" 450 CFM �� I r (PRE- OR POST-TENSIONED), LOCATE THE PRESTRESSED ❑ ❑ ❑ ❑
<br /> °
<br /> \1 V- 6 AFF _ I I � I � OPPOSED BLADE DAMPER OBD
<br /> I TENDONS BY USING A NON-DESTRUCTIVE METHOD PRIOR TO
<br /> ° I I BACKDRAFT DAMPER BDD INSTALLATION. EXERCISE EXTREME CARE AND CAUTION TO U O N 171- Ln
<br /> I I CO,CO,I ( k VOLUME CONTROL DAMPER AVOID CUTTING OR DAMAGING THE TENDONS DURING U [--
<br /> (0)(0)1 � �
<br /> TPC- 8 FLE PACK UNIT, UN'ISE I VCR INSTALLATION. MAINTAIN A MINIMUM CLEARANCE OF ONE INCH ,__, �
<br /> LEF 2.1 I I , W/REMOTE REGULATOR BETWEEN THE REINFORCEMENT AND THE DRILLED-IN ANCHOR V� � �
<br /> I J AND/OR PIN. U
<br /> 572 LBS _ CD3 � FIRE/SMOKE DAMPER F/SD 4� � �
<br /> (208/3/60- 27.7 MCA, - --_ -- --- 50 CFM WITH ACCESS PANEL U Ln `n
<br /> 0 Z J
<br /> 35 MOCP I 11 { I & 3. DUCTWORK SIZES SHOWN ARE INSIDE CLEAR DIMENSIONS. (� `� `�
<br /> Q) CUBIC FEET OF AIR
<br /> WHERE ACOUSTIC LINING IS SHOWN, INCREASE EACH SHEET c�
<br /> CD1 L — _ _ — — _ — — CFM CFM U � 4-1
<br /> U v
<br /> METAL DIMENSION TO ACCOMMODATE LINING & MAINTAIN .�
<br /> 18"x6" 450 CFM PER MINUTE
<br /> 11'- 6"AFF TPC-2A FLEXPA U
<br /> 6 0 6 CLEAR INSIDE DUCT DIMENSIONS SHOWN. 141
<br /> O
<br /> ° UNIT, REF M2.1 M EMS MOTORIZED -
<br /> REQUIRED 606 LBS ROUTE 8"EXHAUST DUCT DUCT DAMPER/PIPE 4. SA DUCTWORK SHALL BE 1"PRESSURE CLASS, AND RA & EA C ,� N
<br /> WORKING 0CD FM NOTED.
<br /> (208/3/60 - 43.4 UP THRU ROOF WITH ROOF VALVE ACTUATOR DUCTWORK SHALL 1 PRESSURE CLASS UNLESS OTHERWISE �Q U Ln
<br /> w CLEARANCE, MCA, 60 MOCP - CAP AND INSECT SCREEN,
<br /> 18"x6" TYPICAL `,° TYPICAL. O THERMOSTAT @ +4'-0" T'STAT
<br /> RTU-2 _ •F__ o TOP OF BOX 5. DUCTS AND PIPING SHALL BE DESIGNED AND INSTALLED TO
<br /> 799 LBS CD 12"o ___ MEET THE REQUIREMENTS OF THE CURRENT EDITION OF THE
<br /> 20"x14"_ _ _ EMS TEMPERATURE - SMACNA DUCT CONSTRUCTION STANDARDS AND SEISMIC 4�
<br /> E
<br /> �� -- -- --- SENSOR +4'-0" TOP �
<br /> CD1 @ RESTRAINT MANUAL. INSTALLER SHALL HAVE A COPY OF THE
<br /> 1 & 450 CFM OFBOXMANUAL ONSITERATTIMEOFINSPECTIONS. WHERE
<br /> -- - 11'- 6"AFF 2"� -- -- F4Fm C�2 7 DISCREPANCIES OCCUR IN THE FIELD. INSPECTION WILL HAVE
<br /> --
<br /> O �1 (3-WAY) ; J 250 AFM DP EMS DIFFERENTIAL DP JURISDICTION, OR JUSTIFICATION SHALL BE PROVIDED FOR
<br /> ' 1 18"x6 JJJ 12'(Q) PRESSURE SENSOR
<br /> A
<br /> M2.0 6„� (4-WAY) STRUCTURAL REVIEW. 2016 CMC 602.3, 603.3 THRU 303.3.3,
<br /> - ��� �--►� DIRECTION OF FLOW - 603.8, SMACNA-HVAC DUCT CONSTRUCTION STANDARDS AND
<br /> 11 EF-1 ----- ]� SUPPLYAIR SA SEISMIC RESTRAINT MANUAL, AND CBC.
<br /> CD1100 CFM RETURN AIR RA
<br /> 350 CFM11
<br /> 18"x6'q! TRANSITION FROM 6. PRIOR TO MECHANICAL PERMIT FINAL, A SMOKE DETECTOR
<br /> 0'- 6”AF _--_-_-_� 18"x6" TO 10"x6". �� EXHAUST AIR EA SHUT-OFF TEST WILL BE REQUIRED. COORDINATE TESTING
<br /> CD1WITH FIRE PREVENTION. IF THERE IS AN ALARM PRESENT, THE El El El ElRG 1 RTU-1 OUTSIDE AIR OSA SMOKE DETECTORS FOR UNIT SHUT-OFF SHALL BE
<br /> 18"x6" 450 CFM 1150 CFM S 6'AFF
<br /> 11'- 6"AFF SUPERVISED BY THE FIRE DETECTION OR ALARM SYSTEM AND
<br /> � c� PIPE/DUCT TURN DOWN - �1 q
<br /> MERCHANDISE 16"o
<br /> INSTALLED IN ACCORDANCE WITH NFPA 72. DETECTION OF
<br /> _ RGI 12"� I I C �Q PIPE/DUCT TURN UP -
<br /> iv I M2.0 SMOKE IN ONE OF THE HVAC SUPPLY DUCT DETECTORS SHALL r w
<br /> 1150 CFM I I >
<br /> ' �� POINT OF CONNECTION POC SHUT OFF THE POWER SOURCE TO ALL OF THE HVAC UNITS. o _ z
<br /> k 16"o �J I' RG- FRESNO FIRE POLICY 407.4 2016 CMC 608.1. I Q " 00 `J z w
<br /> cv i _ ;___� JI lI CD2 450 C M EXISTING (DESIGNATED) (E) r,r�' 1 -` I Q- z
<br /> I I I , �_ I , w
<br /> _ i �, H
<br /> cL_' w Q
<br /> NEW(DESIGNATED) (N) �\\v+k , _i w
<br /> I I __ J I
<br /> ' A 1 28' 14" X11' 1 600 CFM BACKROOM
<br /> cc' M2.0 i 1 1 120 MI DUCT SMOKE DETECTOR SD
<br /> 1 3-WAY
<br /> RTU-1 - ---- - �� O1 ( ) 6„� CD-2 CD
<br /> 1,173 LBS KEYNOTES. (THIS SHEET ONLY) ❑ ❑ ❑ ❑
<br /> 24"x12" 18 FM 1 ---'- - 100 CFM 400 CFM DIFFUSER OR GRILLE TYPE & CFM
<br /> O1 DISCONNECT TYP. REF.
<br /> S M2.0 ES ` OS SPACE TEMP. SENSOR S
<br /> AD 1\ x 6��o ELECTRICAL SHEET
<br /> 200 CFM S H C CD1 ;N
<br /> 11 - 6 AFF 350 CFM
<br /> „ ' S H C SPACE TEMP. /HUMIDITY/ SHC
<br /> RTU-2 "AFF 18 x6
<br /> 8'-6”AFF 0'- 6 CO2 COMBO SENSOR �ED❑
<br /> CD-2 OFFICE �J
<br /> ELBOW WITH TURNING VANES
<br /> STORAGE - 300 CFM
<br /> 10"o _
<br /> ` (3-WAY) CD-3 TEE WITH TURNING VANES El El El El
<br /> 1100 CFM
<br /> A.1 LL A.1 r p
<br /> - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ROUND (OR OVAL) ELBOW V Ln
<br /> I I
<br /> _J11
<br /> ❑ SUPPLYAIR DIFFUSER WITHz Z
<br /> ROUND SUPPLY DUCT U 0 Q
<br /> o 0 0 0 0 0 0 o Q 0 J
<br /> IL
<br /> ( RETURN OR EXHAUST AIR DIFFUSER CD
<br /> WITH ROUND DUCT Q z
<br /> D ., o w
<br /> U
<br /> Z Y
<br /> U W
<br /> UJ UJ
<br /> O U
<br /> UJ
<br /> rn > a> LL
<br /> 20 LU�+ LU
<br /> W Q
<br /> J Q U
<br /> ALL THE REFRIGERATION EQUIPMENT SHOWN COMMISSIONING AND T&B REQUIRED AND A REPORT REF EMS1.0 SHEET FOR ADDITIONAL INFORMATION LAY-IN CEILING NOTE: SUPPLYAIR DEVICES SHALL BE OQROFrESSIpO UJ U Q
<br /> ON THE PROTO DRAWINGS USE REMOTE GENERATED USING 7-ELEVENS COMMISSIONING REPORT REGARDING THE BUILDING ENERGY MANAGEMENT INDICATED AS 3-WAY AIR DEVICES WHEN LOCATED WITHIN �c�� F,� G4^r F =
<br /> CONDENSERS. BCP OPERATORS PLANNING TO TEMPLATE. PROVIDE A COPY TO THE OWNER AND ENGINEER. IF SYSTEM CONTROLS. CONTACT AUTOMATED LOGIC (ALC) A 10'-0"RADIUS OF THE OPEN AIR SANDWICH CASE � 3 y o
<br /> W
<br /> USE SELF-CONTAINED REFRIGERATION HVAC SYSTEM AIRFLOW CANNOT BE BALANCED PER PLANS, AT(866) 390-4275 UPON AWARD OF CONTRACT TO
<br /> EQUIPMENT SHOULD USE APPROPRIATE HEAT CONTACT ENGINEER OF RECORD FOR RESOLUTION. OBTAIN LIST OF CERTIFIED EMS INSTALLERS. DURING / r%ka. ti 2
<br /> LOAD CALCULATIONS TO SIZE THE HVAC UNITS. CONSTRUCTION, AT 2 WEEKS PRIOR TO BUILDING ten. s- 2021 ❑ ❑ ❑ ❑
<br /> THE CUT SHEETS FOR THE SELF-CONTAINED TURNOVER, CONTACT ALC TO COORDINATE DELIVERY s;- �-�, r
<br /> REFRIGERATION EQUIPMENT ARE AVAILABLE OF EMS PANEL. AFTER INSTALLATION OF EMS PANEL Ile' OF CAL\FISSUE DATE: 7-30-19
<br /> SEPARATELY. INCLUDING CONNECTION OF CABLES, CONTACT ALC FOR
<br /> START-UP OF EMS PANEL. START-UP TO BE DONE 2-3 REV. DATE: 12-20-1q
<br /> DAYS PRIOR TO BUILDING TURNOVER.
<br /> LAWRENCE PROJECT NO.: 18008.2
<br /> ENGINEERING GROUP DRAWN BY: NL
<br /> .0 - REFLECTED CEILING PLAN NORTH (559 N. 1-010aple Ave.,Suite 101 Fresno,43 93720
<br /> -13620�-1 (559) 431-0101 19368 FAX(559)431-1362 SHEET:
<br />
|