REFRIGERATION SPECIFICATIONS INSTALLATION SPECIFICATIONS MISCELLANEOUS REFRIGERATED EQUIPMENT
<br /> U)
<br /> Lu
<br /> 1. SCOPE 6. INSTALLATION REQUIREMENTS 1. SCOPE 0
<br /> Z
<br /> Q
<br /> 1.1 HEREAFTER IN THIS SPECIFICATION, THE WORD "MECHANICAL CONTRACTOR"SHALL REFER TO THE 6.1 REFRIGERANT PIPING 1.1 HEREAFTER IN THIS SPECIFICATION, THE WORD "MECHANICAL CONTRACTOR"SHALL REFER TO THE
<br /> INSTALLING MECHANICAL OR REFRIGERATION CONTRACTOR AND "OWNER"SHALL REFER TO 7-ELEVEN. OWNER INSTALLING MECHANICAL OR REFRIGERATION CONTRACTOR AND "OWNER"SHALL REFER TO 7-ELEVEN. OWNER SHALL Y z
<br /> SHALL PURCHASE THE EQUIPMENT AND ARRANGE TO HAVE THAT EQUIPMENT DELIVERED TO THE STORE SITE. THE 6.1.1 ALL SUCTION LINE PIPING SHALL BE SEALED REFRIGERANT GRADE, TYPE L, HARD DRAWN. THE PURCHASE THE EQUIPMENT AND ARRANGE TO HAVE THAT EQUIPMENT DELIVERED TO THE STORE SITE. THE w
<br /> MECHANICAL CONTRACTOR SHALL HAVE THE UPRIGHT REFRIGERATED CABINETS UNCRATED, SET IN PLACE, LEGS LIQUID LINE PIPING SHALL BE SEALED REFRIGERANT GRADE, TYPE C, HARD DRAWN ON ALL MAIN RUNS. MECHANICAL CONTRACTOR SHALL HAVE UNITS UNCRATED, SET IN PLACE, LEGS INSTALLED (IF APPLICABLE), EQUIPMENT T_ a_
<br /> INSTALLED, UPRIGHT REFRIGERATED CABINETS LEVELED, PLACE THE CONDENSING UNITS, MAKE CONNECTIONS THE SHORT SECTION OF TUBING BETWEEN THE MAIN LIQUID LINE AND EXPANSION VALVE SHALL BE SOFT LEVELED, INSTALL THE CONDENSATE DRAIN LINES (IF REQUIRED) AND START UP THE UNITS PER THE INSTALLATION z o z
<br /> FOR THE REFRIGERATION LINES AND ELECTRICAL LINES (WHERE ALLOWED BY LOCAL CODE) BETWEEN THE DRAWN REFRIGERANT TUBING. Q O o
<br /> INSTRUCTIONS PROVIDED WITH THE EQUIPMENT. POWER WIRING FROM THE ELECTRICAL PANEL TO THE WALK-IN COOLER J J U)
<br /> UPRIGHT REFRIGERATED CABINETS AND CONDENSING UNITS, FURNISH AND INSTALL THE CONDENSATE DRAIN o
<br /> LINES AND START UP THE UNITS PER THE INSTALLATION INSTRUCTIONS PACKAGED WITH THE EQUIPMENT. POWER 6.1.2 ALL HORIZONTAL TUBING RUNS SHALL BE SLOPED TOWARD THE COMPRESSOR, AND/OR "P" IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR'S ELECTRICAL SUB-CONTRACTOR. >
<br /> w
<br /> WIRING FROM THE ELECTRICAL PANEL TO THE UPRIGHT REFRIGERATED CABINETS IS THE RESPONSIBILITY OF THE TRAP 1 INCH PER 20 FEET. ALL VERTICALLY RUN SUCTION LINES SHALL BE P-TRAPPED AT THE BASE OF EXACT LOCATIONS OF EQUIPMENT WILL BE DETERMINED BY THE FLOOR PLAN AND MEASUREMENTS AT THE BUILDING AND 0�
<br /> GENERAL CONTRACTOR'S ELECTRICAL SUB-CONTRACTOR. EACH SUCTION RISER OF 4 FEET OR MORE TO ENHANCE OIL RETURN TO THE COMPRESSOR, AND SHALL BE IN COOPERATION WITH CONTRACTORS AND IN ALL CASES, SHALL BE SUBJECT TO APPROVAL OF THE o o w
<br /> P-TRAPPED FOR EACH 20 FEET SECTION OF RISER. OWNER'S DIVISION CONSTRUCTION MANAGER. N
<br /> 2. CODE REQUIREMENTS m
<br /> N
<br /> 6.1.3 ONLY SILVER BASE SOLDER (15% SILVER) SHALL BE USED FOR THIS INSTALLATION.
<br /> 2.1 ALL PROPOSALS SHALL INCLUDE, AND WORK PERFORMED SHALL BE ACCOMPLISHED IN ACCORDANCE 2. CODE REQUIREMENTS
<br /> WITH APPLICABLE LOCAL LAWS, REGULATIONS, ORDINANCES, STATUTES AND CODES, WHICH SHALL BE 6.1.4 REFRIGERANT PIPING IN THE WALK-IN SHALL BE STRAPPED TO ASSURE PIPING SUPPORT. THIS 2.1 ALL PROPOSALS SHALL INCLUDE, AND WORK PERFORMED SHALL BE ACCOMPLISHED IN ACCORDANCE WITH Q 4
<br /> DELINEATED, AND ALL MODIFICATIONS REQUIRED BY THE INSPECTING AUTHORITY SHALL BE MADE BY THE STRAPPING SHALL BE COPPER. IF NON-COPPER STRAPPING IS USED, IT SHALL BE LINED WITH AN ALL APPLICABLE LOCAL LAWS, REGULATIONS, ORDINANCES, STATUTES AND CODES, WHICH SHALL BE DELINEATED,
<br /> MECHANICAL CONTRACTOR WITHOUT ADDITIONAL COST TO THE OWNER. ANY DEVIATIONS REQUIRED DUE TO INSULATING MATERIAL TO PREVENT BI-METALLIC ELECTROLYSIS. REFER TO MANUFACTURER'S AND ALL MODIFICATIONS REQUIRED BY THE INSPECTING AUTHORITY SHALL BE MADE BY THE MECHANICAL
<br /> UNFORESEEN CIRCUMSTANCES, SHALL BE CALLED TO THE ATTENTION OF THE DIVISION CONSTRUCTION MANAGER. INSTALLATION MANUAL FOR RECOMMENDED PIPE SUPPORT SPACING. CONTRACTOR WITHOUT ADDITIONAL COST TO THE OWNER. ANY DEVIATIONS REQUIRED DUE TO UNFORESEEABLE ❑ ❑ ❑ ❑
<br /> 3. GUARANTEE 6.2 REFRIGERANT LEAK TESTING CIRCUMSTANCES, SHALL BE CALLED TO THE ATTENTION OF THE DIVISION CONSTRUCTION MANAGER. This document, the ideas and
<br /> 3. GUARANTEE designs incorporated herein, are
<br /> 3.1 MECHANICAL CONTRACTOR SHALL GUARANTEE ALL WORK AND THE COMPLETE SYSTEM OPERATION 6.2.1 AFTER ALL REFRIGERANT TUBING IS CONNECTED, THE ENTIRE SYSTEM, INCLUDING THE solely the property of VAI and is
<br /> WILL BE FREE FROM DEFECTS IN WORKMANSHIP AND MATERIAL THAT THE MECHANICAL CONTRACTOR PROVIDED CONDENSING UNIT, SHALL BE PRESSURIZED TO 150 PSIG WITH A MIXTURE OF APPROPRIATE REFRIGERANT 3.1 MECHANICAL CONTRACTOR SHALL GUARANTEE THAT THE UNIT HAS BEEN INSTALLED PROPERLY. not to be used, in whole or in
<br /> FOR INSTALLATION, FOR A PERIOD OF 90 DAYS AFTER ACCEPTANCE BY THE OWNER. ANY PART OF THE AND DRY NITROGEN. ALL CONNECTIONS, BOTH FLARED AND SOLDERED, SHALL BE THOROUGHLY part for any project or
<br /> FURNISHED EQUIPMENT ON THIS INSTALLATION WHICH PROVES DEFECTIVE, OR WAS DAMAGED IN SHIPMENT, CHECKED WITH AN ELECTRONIC OR HALIDE LEAK DETECTOR. ALL LEAKING SOLDER CONNECTIONS SHALL 3.2 MECHANICAL CONTRACTOR SHALL PROVIDE THE FOLLOWING INFORMATION TO THE EQUIPMENT duplication, without written
<br /> SHALL BE HANDLED AS STATED IN PARAGRAPH 4 ENTITLED "MECHANICAL CONTRACTOR INSPECTION BE DISASSEMBLED, CLEANED AND RE-SOLDERED. authorization.
<br /> RESPONSIBILITIES".
<br /> ©
<br /> 3.2 MECHANICAL CONTRACTOR SHALL GUARANTEE THAT THE UNIT HAS BEEN INSTALLED PROPERLY. 6.3 EVACUATION 3.2.1 MODEL NUMBER OF THE UNIT COPYRIGHT 2019
<br /> 6.3.1 THE COMPLETE SYSTEM SHALL BE EVACUATED WITH A VACUUM PUMP. THE REFRIGERATIONElEl El El
<br /> 3.3 MECHANICAL CONTRACTOR SHALL PROVIDE THE FOLLOWING INFORMATION TO THE EQUIPMENT COMPRESSOR SHALL NOT BE USED TO EVACUATE THE SYSTEM. 3.2.2 SERIAL NUMBER OF THE UNIT
<br /> MANUFACTURER'S DISTRIBUTOR, AND TO THE OWNER IF DEFECTS ARE ENCOUNTERED WITH THE EQUIPMENT. 3.2.3 DATE OF INSTALLATION U O N 71- It-
<br /> 6.3.2
<br /> 6.3.2 THE COMPLETE SYSTEM, TO INCLUDE THE CONDENSING UNIT, SHALL BE EVACUATED A �.i
<br /> 3.3.1 MODEL NUMBER OF THE UNIT. MINIMUM OF THREE TIMES. THE VACUUM SHALL BE BROKEN THE FIRST AND SECOND TIME AT 500 MICRONS U c�
<br /> USING APPROPRIATE REFRIGERANT. THE THIRD VACUUM SHALL BE BROKEN BY THE CHARGING 3.2.4 DETAILED ACCOUNT OF THE PROBLEM, DIAGNOSIS, AND REPAIR WORK REQUIRED .� C N N
<br /> 3.3.2 SERIAL NUMBER OF THE UNIT. REFRIGERANT. c�
<br /> 3.2.5 PARTS REQUIRING REPLACEMENT c/� -4
<br /> 3.3.3 DATE OF INSTALLATION 6.4 SUCTION LINE INSULATION 3.2.6 STORE NUMBER AND ADDRESS 'd
<br /> 3.3.4 DETAILED ACCOUNT OF THE PROBLEM, DIAGNOSIS, AND REPAIR WORK REQUIRED. 6.4.1 THE MAIN SUCTION LINE INSIDE THE COOLER (VAULT) TO INCLUDE THE "P" TRAP, THE VERTICAL 3.3 MECHANICAL CONTRACTOR SHALL FURNISH TO THE OWNER'S REPRESENTATIVE ALL CERTIFICATES
<br /> SUCTION RISER, ALL ABOVE ROOF SUCTION PIPING SHALL BE INSULATED WITH 1/2" WALL ARMAFLEX OR ITS x
<br /> 3.3.5 PARTS REQUIRING REPLACEMENT. EQUIVALENT. ALL JOINTS SHALL BE PROPERLY SEALED WITH APPROVAL BY INSULATION MANUFACTURER'S OF FINAL INSPECTION AND APPROVAL FROM INSPECTION AUTHORITIES HAVING JURISDICTION. U (>
<br /> ADHESIVE OR SEALANT. 4. +� p
<br /> 3.3.6 STORE NUMBER AND ADDRESS.
<br /> INSTALLATION REQUIREMENTS '41
<br /> O
<br /> 6.5 CONDENSATE DRAIN LINES 4.1 GENERAL =-+ Ln U
<br /> 3.4 MECHANICAL CONTRACTOR SHALL FURNISH TO THE OWNER'S REPRESENTATIVE ALL CERTIFICATES OF p N
<br /> FINAL INSPECTION AND APPROVAL FROM INSPECTION AUTHORITIES HAVING JURISDICTION. 6.5.1 CONDENSATE DRAIN LINE MATERIAL SHALL BE 1"O.D. HARD DRAWN COPPER TUBING. U L w
<br /> MECHANICAL CONTRACTOR SHALL INSTALL HEAT TRACE IN LOW TEMP SECTION OF VAULT. REF ELECTRICAL 4.1.1 THE EQUIPMENT FROM VARIOUS MANUFACTURERS IS CONFIGURED SIMILARLY WITH MINOR �O
<br /> SPECIFICATIONS SECTION 3.5.12 FOR HEAT TRACE REQUIREMENTS. DIFFERENCES DUE TO INDIVIDUAL MANUFACTURER'S DESIGN. INSTALLATION INSTRUCTIONS ARE BASICALLY
<br /> SIMILAR FOR EACH MANUFACTURER'S EQUIPMENT.
<br /> 6.5.2 THE LINES SHALL BE CAPABLE OF BEING OPENED AS CLOSE TO THE EVAPORATOR DRAIN 4.2 RETAIL REFRIGERATION EQUIPMENT
<br /> AS POSSIBLE TO ALLOW EFFECTIVE CLEANING.
<br /> WALK IN COOLER REFRIGERATION SYSTEM INSTALLATION 2
<br /> . .
<br /> 41 INSTALLATION INSTRUCTIONS 4�
<br /> 6.5.3 THE DRAIN LINE SHALL BE TRAPPED ON A VERTICAL SLOPE PRIOR TO REACHING THE
<br /> SPECIFICATION INTRODUCTION: RECEIVING FLOOR DRAIN OR PIT(WHICHEVER IS ALLOWABLE UNDER LOCAL CODES). PARTS REQUIRED:
<br /> THE CONTRACTING FOR INSTALLATIONS OF WALK-IN REFRIGERATION EQUIPMENT WILL BE ACCOMPLISHED IN6.5.4 THE DRAIN LINE SHALL HAVE A DEFINITE SLOPE AWAY FROM THE EVAPORATOR OR DRAIN 1. R404A REFRIGERANT. UP TO 15LBS 4 OZ PER CONDENSER.
<br /> THE FIELD AT THE DIVISION LEVEL. THESE SPECIFICATIONS ARE TO AID IN PREPARATION OF NATIONAL PIT(WHICHEVER IS ALLOWABLE UNDER LOCAL CODES). THE DRAINS FROM THE EVAPORATORS SHALL BE 2. WALL MOUNTED ELECTRICAL JUNCTION BOX WITH STRAIN RELIEF
<br /> STANDARD CONTRACT DOCUMENTS. JOINED TO MAIN DRAIN LINE WHICH SHALL RUN TO A DRAIN LOCATION SHOWN ON THE MECHANICAL PLAN 3. 50 FEET(MAX) OF ELECTRICAL CONDUIT WITH MINIMUM AWG 22 STRAND 7X30 WIRE.
<br /> AND SHALL BE FIRMLY SUPPORTED WITH STRAPS AT LEAST EVERY SIX FEET ALONG THE DRAIN RUN. 4. MOUNTING HARDWARE FOR JUNCTION BOX BRACKETS, CLAMPS AND REMOTE CONDENSER.
<br /> 1. SCOPE 6.6 SYSTEM SET-UP
<br /> CONTENTS OF KIT:
<br /> 1.1 HEREAFTER IN THIS SPECIFICATION, THE WORD "MECHANICAL CONTRACTOR"SHALL REFER TO THE 6.6.1 THE OIL LEVEL IN THE COMPRESSOR SIGHT GLASS SHALL BE BETWEEN 1/3 AND 1/2 FULL AT 1. REMOTE CONDENSER
<br /> INSTALLING MECHANICAL OR REFRIGERATION CONTRACTOR AND "OWNER"SHALL REFER TO 7-ELEVEN. ALL TIMES (FOR SEMI-HERMETIC COMPRESSORS ONLY. HERMETIC COMPRESSORS DO NOT HAVE OIL SIGHT 2. FLEXIBLE LINE SET
<br /> OWNER SHALL PROVIDE THE WALK-IN COOLER AND FREEZER REFRIGERATION SYSTEMS TO THE MECHANICAL GLASS).
<br /> CONTRACTOR AT HIS SHOP OR DESIGNATED STORAGE FACILITY, AND SHALL INCLUDE THE HEA TCRAFT DISCONNECT FITTINGS
<br /> 4. 50 FEET 3. QUICK OF INSULATED LINE SET
<br /> CONDENSER WITH ALL CONTROLS, LIQUID DRIERS, SIGHT GLASS, SUCTION FILTERS, SUCTION ACCUMULATORS, 6.6.2 THE PROPER AMOUNT OF REFRIGERANT SHALL BE CHARGED INTO THE SYSTEM WITH THE . 50 FEET OF 5/8"INSULATED LINE SET El El El ElLOW AMBIENT HEAD PRESSURE CONTROLS, ALL FACTORY INSTALLED. THE EVAPORATOR FAN COILS SHALL COMPRESSOR OPERATING AT THE PROPER HEAD PRESSURE (SEE MANUFACTURER'S SPECIFICATIONS). 55. COPPER ELBOW FITTINGS
<br /> INCLUDE A BEACON MICRO-PROCESSOR BOARD, ELECTRIC EXPANSION/SOLENOID VALVES, THERMISTORS, ALL 7. MOUNTING STRUT AND CLAMPS Q
<br /> FACTORY MOUNTED. THE MECHANICAL CONTRACTOR SHALL INSTALL THE SYSTEM AS SHOWN ON THE 6.6.3 ONLY SUNISO-3GS OIL SHALL BE USED ION THE MEDIUM TEMP SYSTEMS AND MOBIL EAL
<br /> MECHANICAL PLANS AND SHALL FURNISH THE REFRIGERANT PIPING, SUCTION LINE INSULATION, CONDENSATE ARCTIC 22 CC OIL SHALL BE USED IN THE LOW TEMP SYSTEMS. 8. JUMPER FOR ELECTRICAL CONNECTION
<br /> DRAIN LINES, AND REFRIGERANT AS REQUIRED. EXACT LOCATION OF THE CONDENSING UNIT(S) AND r s, �., , Q w
<br /> EVAPORATOR COILS WILL BE DETERMINED BY THE PLANS. INSTALLATION INSTRUCTIONS: r� 00 , , z
<br /> 6.6.4 THE THERMOSTATIC EXPANSION VALVE SUPERHEAT IS CONTROLLED BY THE BEACON 0) `_,,
<br /> MICRO-PROCESSOR BOARD AND IS FACTORY SET AT 8 DEG. THE MECHANICAL CONTRACTOR SHALL CHECK �,, 00
<br /> 2. CODE REQUIREMENTS AND PERMITS 1. UNPACK CONDENSER
<br /> THE SUPERHEAT AT THE COMPRESSOR TO ENSURE THE COMPRESSOR SUPERHEAT MEETS THE N ! J E z i
<br /> 2. CONDENSER INSTALLATION +`�:�� � •� �• � �
<br /> 2.1 ALL WORK SHALL BE ACCOMPLISHED IN ACCORDANCE WITH ALL APPLICABLE LOCAL LAWS, COMPRESSOR MANUFACTURER'S GUIDELINES. THE MECHANICAL CONTRACTOR MAY HAVE TO ADJUST ',^;, Q
<br /> 3. REFRIGERATION LINE INSTALLATION
<br /> SUPERHEAT AT BEACON BOARD TO CORRECT INCORRECT SUPERHEAT READINGS AT THE COMPRESSOR.
<br /> REGULATIONS ORDINANCES STATUTES AND CODES AND ALL MODIFICATIONS REQUIRED BY THE INSPECTION 4. ELECTRICAL CONNECTIONS
<br /> AUTHORITY SHALL BE MADE BY THE MECHANICAL CONTRACTOR WITHOUT ADDITIONAL COST TO THE OWNER. 6.6.4.1 THE WALK-IN COOLER AND FREEZER THERMOSTATS AREA PART OF THE BEACON MICRO- 5. FBD UNIT INSTALLATION
<br /> PROCESSOR SYSTEM AND ARE FACTORY MOUNTED. THE MECHANICAL CONTRACTOR SHALL PROGRAM THE 6. REFRIGERANT CHARGING
<br /> 2.2 OBTAIN, PAY FOR AND FURNISH ALL REFRIGERATION PERMITS REQUIRED BY LOCAL OR STATE BEACON 1/BOARDS AS FOLLOWS: 7. UNIT STARTUP
<br /> ORDINANCES OR CODES. INSTALLATION: El L1 El L12.3 NO EXTRAS SHALL BE ALLOWED DUE TO CONDITIONS WITH WHICH THE MECHANICAL CONTRACTOR VAULT COOLER TEMPERATURE SETPOINTS:
<br /> SHOULD HAVE BEEN FAMILIAR. VAULT COOLER: +38° F 1. UNPACK CONDENSER: CAREFULLY UNPACK THE CONDENSING UNIT.
<br /> VAULT ICE: +20° F 2. CONDENSER INSTALLATION: INSTALL THE REMOTE CONDENSER ACCORDING TO THE
<br /> 3. GUARANTEE VAULT FREEZER: -10° F DOCUMENT "INSTALL AND MAINTENANCE DATA"PROVIDED WITH THE CONDENSER.
<br /> OTHER REFRIGERATION EQUIPMENT TEMPERATURE SETPOINTS:
<br /> 3.1 MECHANICAL CONTRACTOR SHALL GUARANTEE ALL WORK AND THE COMPLETE SYSTEM OPERATION SANDWICH CASE: +32° F 4.2.2 ICE MAKER PIPED TO THE HEATCRAFT FLEXPACK UNIT. PRECHARGED REFRIGERANT
<br /> WILL BE FREE FROM DEFECTS IN WORKMANSHIP AND MATERIAL THAT THE MECHANICAL CONTRACTOR CONDIMENT STATION: +38' F
<br /> PROVIDED FOR INSTALLATION, FOR A PERIOD OF 90 DAYS AFTER ACCEPTANCE BY THE OWNER. ANY PART OF LINE SET FURNISHED BY THE ICE MAKER MANUFACTURER.)
<br /> THE FURNISHED EQUIPMENT ON THIS INSTALLATION WHICH PROVES DEFECTIVE, OR WAS DAMAGED IN ICE CREAM CASE: -10° F
<br /> ICED COFFEE/CREAM DISPENSER: +38° F 4.2,3 SANDWICH CASE PIPED TO REMOTE CONDENSING UNIT. PRECHARGED REFRIGERANT
<br /> SHIPMENT, SHALL BE HANDLED AS STATED IN PARAGRAPH 4 ENTITLED "MECHANICAL CONTRACTOR INSPECTION UNDER COUNTER REFRIGERATED STORAGE: +38° F LINE SET FURNISHED BY THE MECHANICAL CONTRACTOR.
<br /> RESPONSIBILITIES". BACKROOM FREEZER: +10' F
<br /> )
<br /> 3.2 MECHANICAL CONTRACTOR SHALL FURNISH TO THE OWNER REPRESENTATIVE ALL CERTIFICATES OF 6.7 PENETRATIONS 4.2.4 SLURPEE (PIPED TO THE HEATCRAFT FLEXPACK UNIT. PRECHARGED REFRIGERANT
<br /> FINAL INSPECTION AND APPROVAL FROM INSPECTION AUTHORITIES HAVING JURISDICTION. LINE SET FURNISHED BY THE SLURPEE MANUFACTURER.)
<br /> 6.7.1 ALL OPENINGS THROUGH THE WALK-IN PANELS REQUIRED FOR HANGERS, CONDENSATE ❑ ❑ ❑ ❑
<br /> 4. MECHANICAL CONTRACTOR INSPECTION RESPONSIBILITIES 4.3 CONDENSATE DRAIN
<br /> DRAIN LINES, STRAPPING AND REFRIGERANT PIPING SHALL BE SEALED EXTERIOR AND INTERIOR BY THE o
<br /> 4.1 CHECK EACH PIECE OF REFRIGERATION EQUIPMENT FOR DAMAGES AND SHORTAGES. IF SUCH MECHANICAL CONTRACTOR TO PREVENT MOISTURE FROM ENTERING THE INSULATION, AND TO MAINTAIN 4.3.1 NORMALLY, THE CONDENSATE DRAIN CONNECTION INCLUDED WITH THE UNIT, WILL BE STUBBED OUT AT THE �
<br /> CONDITIONS EXIST, THE MECHANICAL CONTRACTOR SHALL: THE WALK-IN VAPOR BARRIER. BOTTOM OF THE CABINET, (IF REQUIRED). MECHANICAL CONTRACTOR SHALL FURNISH AND INSTALL A DRAIN LINE FROM THE rn
<br /> 6.7.2 THE MECHANICAL CONTRACTOR SHALL SEAL OFF ALL PASS-THROUGH OPENINGS CABINETS TO THE FLOOR DRAIN. IT SHALL BE PERMISSIBLE TO MANIFOLD THE DRAINS INTO A COMMON DRAIN LINE THE Q
<br /> 4.1.1 OBTAIN INSPECTION REPORT IN DUPLICATE FROM THE COMMON CARRIER AND NOTIFY OWNER REQUIRED FOR REFRIGERANT TUBING IN ACCORDANCE WITH REQUIREMENTS STATED ON MECHANICAL MANIFOLD SHALL BE 1 INCH DIAMETER MINIMUM. COPPER WILL BE ACCEPTABLE. EACH DRAIN CONNECTION SHALL BE FULL z
<br /> OFFICE AND REFRIGERATION EQUIPMENT SUPPLIER IMMEDIATELY. PLAN. C) "'
<br /> SIZE OF THE EQUIPMENT DRAIN CONNECTION SERVED. Q 0
<br /> 4.1.2 MAKE REPAIRS WHEN AUTHORIZED TO DO SO BY MANUFACTURER'S REPRESENTATIVE, 7. ELECTRICAL 4.4 UNIT STARTUP AND CHECKOUT J Z _J
<br /> ILL
<br /> REPLACING ANY MALFUNCTIONING PART(S) ON THE EQUIPMENT WITHOUT CHARGE TO THE OWNER. 4.4.1 MECHANICAL CONTRACTOR SHALL FOLLOW THE SPECIFIC UNIT INSTALLATION PROCEDURES WHICH ARE Q
<br /> 5. EQUIPMENT 7.1 ALL PROVISIONS FOR WIRING (LINE VOLTAGE AND BEACON LOW VOLTAGE) SHALL BE BY THE PACKAGED WITH EACH PIECE OF EQUIPMENT WHEN DELIVERED TO THE STORE. U
<br /> ELECTRICAL CONTRACTOR. FINAL BEACON LOW VOLTAGE WIRING CONNECTIONS SHALL BE BY THE - CD
<br /> MECHANICAL CONTRACTOR. z Z
<br /> 5.1 EVAPORATOR FAN COILS 5.2 CHECK EACH PIECE OF REFRIGERATION EQUIPMENT FOR DAMAGES. NOTIFY THE OWNER'S DIVISION OFFICE 0 O
<br /> THE MECHANICAL CONTRACTOR SHALL HANG THE EVAPORATOR COILS IN ACCORDANCE WITH THE MECHANICAL 8. MECHANICAL CONTRACTOR CLEAN-UP RESPONSIBILITIES IMMEDIATELY. MAKE REPAIRS ONLY WHEN AUTHORIZED TO DO SO.
<br /> PLAN. ALL MOUNTING HARDWARE, TO INCLUDE A BEARING SURFACE FOR THE HANGER RODS, SHALL BE 5. MECHANICAL CONTRACTOR RESPONSIBILITIES Z U Q
<br /> 8.1 REMOVE ALL CRATING FROM PREMISES.
<br /> FURNISHED BY THE MECHANICAL CONTRACTOR. THE EVAPORATOR FAN COILS ARE IN NO CIRCUMSTANCE TO BE 5.3 OBTAIN, PAY FOR AND FURNISH ALL REFRIGERATION PERMITS REQUIRED BY LOCAL OR STATE ORDINANCES OR O U
<br /> -
<br /> SUPPORTED BY THE WALK-IN COOLER PANELS ALONE. 8.2 REMOVE ALL LABELS AND CLEAN CONDENSING SURFACES IF REQUIRED, AND STRAIGHTEN CODES. UJ
<br /> U) LL
<br /> 5.2 APPROVED COOLER (VAULT) REFRIGERATION EQUIPMENT MANUFACTURERS AND MODEL NUMBERS CONDENSING COIL FINS IF REQUIRED. 5.1 REMOVE ALL CRATING FROM PREMISES. UJ } C)
<br /> (R404a MEDIUM TEMP/404a LOW TEMP) 8.3 TOUCH-UP AND REPAIR PAINT AS REQUIRED. 5.4 COMPLY WITH ALL LOCAL AND STATE CODES; IN JURISDICTION WHENEVER THE SPECIFICATIONS DO NOT MEET U) > Q
<br /> '
<br /> CODES, THE CODES SHALL TAKE PREFERENCE. NOTIFY OWNERS DIVISION CONSTRUCTION OFFICE REGARDING REQUIRED
<br /> 5.2.1 HEATCRAFT/BORN FLEXPACK UNIT CONTAINING (1) MEDIUM TEMP COMPRESSOR FOR VAULT � J
<br /> COOLER, (1) LOW TEMP COMPRESSOR FOR VAULT ICE STORAGE, AND (1) LOW TEMP COMPRESSOR FOR MODIFICATIONS. O UJ Lii Q
<br /> VAULT FREEZER STORAGE. 5.5 NO EXTRAS SHALL BE ALLOWED DUE TO CONDITIONS WITH WHICH THE MECHANICAL CONTRACTOR SHOULD HAVE J Q U
<br /> BEEN FAMILIAR. Z
<br /> 6. ELECTRICAL o��FnSSGp� O UJ U =
<br /> 6.1 ALL PROVISIONS FOR WIRING, EXCEPT LOW VOLTAGE CONNECTIONS, SHALL BE BY THE ELECTRICAL CONTRACTOR. y C)
<br /> FINAL CONNECTIONS SHALL BE BY THE MECHANICAL CONTRACTOR FOR LOW VOLTAGE. 3 `� r1 c w co
<br /> PLL
<br /> ti
<br /> 6.2 ALL ELECTRICAL POWER SUPPLY WIRING SHALL BE BY ELECTRICAL CONTRACTOR.
<br /> M. 9- -2021 ❑ ❑ ❑ ❑
<br /> 6.3 ALL LINE VOLTAGE CONTROL WIRING FROM THE RETAIL REFRIGERATION EQU1VV0-T7TATHE CONDENSER UNIT(S) `r!qT �'HAN��
<br /> SHALL BE BY THE ELECTRICAL CONTRACTOR. ISSUE DATE: 7-30-19
<br /> REV. DATE: 12-20-1q
<br /> LAWRENCEPROJECT NO.: 18008.2
<br /> ENGINEERING GROUP DRAWN BY: NL
<br /> � M-3.0 - MECHANICAL SPECIFICATIONS 7084 N.Maple Ave.,Suite 101 Fresno,CA 93720
<br /> (559) 431-0101 19368 FAX(559)431-1362 SHEET:
<br /> M -3 . 0