Laserfiche WebLink
Site Assessment Work Plan Out - 3 - 26 April 2002 <br />G. Water Level Measurement <br />Elevation reference point at each monitoring well shall be within 0.01 foot. Ground surface <br />elevation at each monitoring well shall be within 0.1 foot. Method and time of water level <br />measurement shall be specified. <br />QA/QC PROCEDURES <br />Specify number of field blanks and duplicates. <br />TIME SCHEDULE FOR PROPOSED WORK <br />The work plan shall include a time schedule for implementation of work.