My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
2096
>
2900 - Site Mitigation Program
>
PR0522097
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2021 1:37:56 AM
Creation date
5/26/2021 4:05:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0522097
PE
2960
FACILITY_ID
FA0015058
FACILITY_NAME
SCHMIEDT SOIL SERVICE
STREET_NUMBER
2096
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
APN
22404021
CURRENT_STATUS
01
SITE_LOCATION
2096 S MAIN ST
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�KL KLEINFFLDER <br /> The water samples collected from the domestic well and three monitoring wells would be analyzed <br /> for: <br /> • Organochlorine Pesticides,by EPA Methods 8080/8081 <br /> • Fumigants (including ethylene dibromide, 1,3-dichloropropene, and dibromochloropropane, <br /> by EPA Method 8011 <br /> • Fertilizer constituents (including ammonium, nitrate, nitrogen, phospate, and sulfate), by <br /> various EPA Methods <br /> • Carbamates, by EPA Method 632M <br /> • Organophosphates, by EPA Method 8140 <br /> • Metals, by EPA Methods <br /> • Total Dissolved Solids,by EPA Method 160.1 <br /> The soil samples previously collected during well installation will be submitted separately from <br /> the groundwater samples collected after well development. The samples will be analyzed on a <br /> normal laboratory schedule requiring approximately three weeks (21 total days) for completion. <br /> The soil samples collected during the monitoring well installation will be analyzed for: <br /> • Organochlorine Pesticides,by EPA Methods 8080/8081 <br /> • Fumigants (including ethylene dibromide, 1,3-dichloropropene, and dibromochloropropane, <br /> by EPA Method 8011 <br /> • Fertilizer constituents (including ammonium, nitrate, nitrogen, phospate, and sulfate), by <br /> various EPA Methods <br /> • Carbamates,by EPA Method 632M <br /> • Organophosphates,by EPA Method 8140 <br /> • Metals,by EPA Methods <br /> 27125.1301 /ST03R657 Page 10 of 15 <br /> Copyright 2003,Kleinfelder,Inc. May 23,2003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.