Laserfiche WebLink
L & M OPERABLE UNIT- FIRST QUARTER 2012 SITE STATUS, REMEDIAL SUMMARY, <br />AND GROUNDWATER MONITORING REPORT <br />April 30, 2012 <br />I:\Tidewater\TW Stockton (P2A)\QMRs\2012\1Q12\1Q12 QSSR QRSR QMR Stockton_FINAL.doc 7.1 <br />7.0 Limitations <br />This report presents our understanding of existing conditions at the subject Site. The <br />conclusions contained herein are based on the analytical results, and professional judgment in <br />accordance with current standards of professional practice; no other warranty is expressed or <br />implied. Stantec assumes no responsibility for exploratory borings or data provided or reported <br />by other consultants or contractors. Wallace-Kuhl monitors and samples wells MW-3, MW-5, <br />MW-6 through 8, MW-11, MW-37 through 39, 2BMW-1, and 2AMW-15 on behalf of the City of <br />Stockton and provides preliminary data for use in this report. Stantec assumes that the finalized <br />data gathered for the UOU and MOU during 1Q12 will be submitted by the City of Stockton <br />under separate cover.