Laserfiche WebLink
Air Sparging Pilot Test Related Activities Report and Remedial Action Work Plan <br />Former Countryside Market, Stockton, California April 30, 2015 <br />Section 4.0: Air Sparqe Feasibility Testing <br />This section presents the procedures for the air sparge feasibility testing conducted at the Site. <br />Section 5.0: Air Sparqe Testing Summary and Conclusion <br />This section presents a detailed summary of air sparge testing at the Site. <br />Section 6.0: Remediation Work Plan <br />This section presents the plan for installation of an air sparge and soil vapor extraction system at <br />the Site, including system design, permitting, installation and start-up. <br />Section 7.0: Reporting <br />This section provides details associated with the start-up and ongoing progress reporting for the <br />Site. <br />Section 8.0: Estimated Project Schedule <br />This section provides an estimated project schedule from remediation system installation through <br />Site closure/post-remediation monitoring. <br />Section 9.0: References <br />This section provides citations to the documents referenced in this report. <br />1-2 The Source Group, Inc.