My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COPPEROPOLIS
>
10848
>
2900 - Site Mitigation Program
>
PR0536777
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2021 2:35:44 PM
Creation date
5/27/2021 2:24:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0536777
PE
2960
FACILITY_ID
FA0021126
FACILITY_NAME
FORMER COUNTRYSIDE MARKET
STREET_NUMBER
10848
STREET_NAME
COPPEROPOLIS
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10311006
CURRENT_STATUS
01
SITE_LOCATION
10848 COPPEROPOLIS RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Air Sparging Pilot Test Related Activities Report and Remedial Action Work Plan <br />Former Countryside Market, Stockton, California April 30, 2015 <br />Section 4.0: Air Sparqe Feasibility Testing <br />This section presents the procedures for the air sparge feasibility testing conducted at the Site. <br />Section 5.0: Air Sparqe Testing Summary and Conclusion <br />This section presents a detailed summary of air sparge testing at the Site. <br />Section 6.0: Remediation Work Plan <br />This section presents the plan for installation of an air sparge and soil vapor extraction system at <br />the Site, including system design, permitting, installation and start-up. <br />Section 7.0: Reporting <br />This section provides details associated with the start-up and ongoing progress reporting for the <br />Site. <br />Section 8.0: Estimated Project Schedule <br />This section provides an estimated project schedule from remediation system installation through <br />Site closure/post-remediation monitoring. <br />Section 9.0: References <br />This section provides citations to the documents referenced in this report. <br />1-2 The Source Group, Inc.
The URL can be used to link to this page
Your browser does not support the video tag.