Laserfiche WebLink
No. <br />San Joaquin County <br />Environmental Health Department <br />600 East Main Street <br />Stockton, California 95202-3029 <br />DIRECTOR <br />Donna Heran, REHS <br />PROGRAM COORDINATORS <br />Robert McClellan, REHS <br />Jeff Carruesco, REHS, RDI <br />Kasey Foley, REF'S <br />Linda Turkatte, REHS Website: www.sjgov.org/ehd <br />Phone: (209) 468-3420 <br />Fax: (209) 464-0138 <br />November 9, 2011 <br /> <br />KARAMJEp- JOHAL <br />10228 HALL AVE. <br />RICHMOND, BRITISH COLUMBIA V6X-3T9 <br />PARMDIP JOHAL <br />7391 NEVIS DRIVE <br />RICHMOND, BRITISH COLUMBIA V7A-1J5 <br />DEPUTY DHALIWAL <br />15420 SE 80TH STREET <br />NEWCASTLE, WA 98059 <br />RE: 3032 E Waterloo Road LOP Site Code: 1758 <br />Stockton, CA <br />The San Joaquin County Environmental Health Department (EHD) is the lead agency <br />providing the oversight of the investigation and cleanup of releases from underground <br />storage tanks (USTs) within San Joaquin County. The above referenced site was <br />placed in the Local Oversight Program (LOP) on February 2, 1999, for site <br />contamination cleanup caused by the unauthorized release from former leaking USTs. <br />At the time this site was placed in the LOP for investigation and cleanup, the EHD had <br />listed Gurpal Sidhu as the sole responsible party. Since then, the EHD has been <br />provided a certified list of record fee title owners, in accordance with Section 25297.15 <br />(a) of Chapter 6.7 of the California Health and Safety Code, which includes the above <br />parties addressed in this letter. The parties above have been listed as additional <br />responsible parties for completion of the required ground water investigation and <br />cleanup (see attached Notice of Responsibility). <br />The EHD sent a directive letter to Gurpal Sidhu on October 12, 2011, requiring him to <br />resume ground water pump and treat remediation that had been suspended without the <br />approval of the EHD. The EHD had also approved a work plan (WP) to continue the <br />assessment of impacted ground water. The EHD has issued directives to Mr. Sidhu to <br />implement the approved WP. Mr. Sidhu did not meet the required compliance deadline <br />and did not attend the scheduled EHD Administrative Office Hearing on November 1, <br />2011. <br />On November 1, 2011, EHD staff met with your attorney Clarence Chan and your <br />consultant William Little from Advance Geo Environmental (AGE). At the meeting, the <br />EHD concerns with cleanup compliance and implementing the additional assessment <br />WP were conveyed to your representative and your consultant.