Laserfiche WebLink
The following is to be submitted i i statement to complete the Compliance Certification process. Total 3 pages. <br />Page 2. Notice to Abate. .)(Definition : to put an end to <abate a nuisance> b: nullify 1 <abate a writ>. 2. a : to reduce in <br />degree or intensity.) <br />Line 4: Complaint: Civil. Granted by Attorney for lease holder. Record ID C00035127 <br />Area 5: The terming in the original complaint is false: Based on Historical Data. This is a false report related to <br />Generating and Storing HAS MAT waste. Equip sales and repair may process some sort of waste and G70 has measures <br />established with local agencies in assurance and G70's model falls under county guidelines. <br />Line 6 & 7: Removal and disposal . Assigned Vender American Oil Recovery Inc. <br />Line 8 through 19 is as addressed above on page one. <br />Line 20: Topic is Waste Piping: Substance of unknown origin. Full hazmat suit of un-known substance recommend <br />remove to the "Pest Hole". Kiefer Landfill Facility. Follow these recommendations. Full hazmat suited, gently place in <br />strong construction lined double bagging. This trace amounts do not constitute a hazard. Origin of placement is <br />unknown. See attached images and receipt from Kiefer landfill. Min 25.00 Disposal. <br />Page 3. Summary of Violations Continued from Page one. <br />Department of Environmental Health. See attached copy of G70 Policies and procedures. <br />This is addressed above page one line 7 <br />See attached page one and page two identification of site through inspection. See above pages for G70 removal of <br />hazards waste. See attached images and receipts from outsourced facilitators and vendors. <br />As addressed prior this information was removed to administrative office during site security change-up. See <br />attached. Re-post on security trailer/site office. <br />The waste addressed prior is on schedule to scheduled removal. Plans are as addressed in the Control policies, <br />procedures and operations maintenance guidelines attached. <br />Due to unforeseen intrusions and complications in business relations, G70 was unable a level of operation to obtain <br />local or outside part or full time employees. There is no employment opportunities at this time.