Laserfiche WebLink
Remediation Bid <br />David Parker <br />Holt, California <br />May 7,2012 <br />Proposal No. 1085 <br />Page 3 <br />Excavation, profiling and disposal of contaminated groundwater <br />Signing of hazardous waste manifests on behalf of the generator <br />Construction water <br />Dewatering <br />Marking the site for USA clearance (to be performed by owner) <br />Locate existing utilities <br />Relocate existing utilities <br />Demo of existing utilities <br />Striping restoration and/or signage restoration <br />Temporary fence <br />Traffic control <br />Permission from property owner <br />Testing (compaction and material) <br />Dealing with unsuitable material (excessive moisture is considered unsuitable) <br />Electrical <br />Bond premium <br />Erosion control <br />Maintenance of erosion control measures <br />Sheeting/shoring - trenches are figured as open cut <br />Cleanup of trench and footing spoils created by others <br />Providing backfill and compaction to the excavation <br />Geotechnical testing <br />Screening <br />Crush rock, asphalt or concrete <br />Clarifications, Terms & Conditions <br />Anything not specifically included is excluded. <br />CES and its subcontractors are open-shop contractors with no union affiliations and will <br />not sign a one-job agreement unless indicated in writing by CES <br />This proposal is contingent upon the execution of a mutually agreeable contract that <br />would include the attachment of this proposal and conditions therein <br />Mobilization includes one move-in, only <br />Excavation can be dug with a mini-excavator <br />Not responsible for damage by others <br />Not responsible for damage or repairs due to wheel loading associated with construction <br />activities <br />Payment terms: 20 percent in advance, 80 percent billed upon completion, net 30 days <br />Re-vegetation of disturbed areas will be provided or performed by others <br />Price must be accepted within 5 days <br />Not responsible for delays due to rain, note that rain delays due to a weather event <br />include dry up days <br />Owner to provide adequate area to stage equipment & materials <br />CES to be compensated for any deviation and/or change from the scope or work <br />identified in this proposal that results in an increase of work, time to construct, and/or <br />rework <br />The work shall not be broken up and/or phased without the approval of CES