Laserfiche WebLink
Ms. Vera Fischer, P.G., RWQCB April 24, 2017 <br />Work Plan for Additional Site Assessment Project No. 2154-1817-01 <br />1817 South Fresno Avenue, Stockton, CA <br />Page 4 <br />In March 2015, Stratus prepared and submitted a Remedial Action Work Plan for <br />the Site, which proposed using CH remediation at the Site, and the work scope was <br />subsequently approved by the SJCEHD. After obtaining a Waste Discharge <br />Requirement (WDR) permit from the RWQCB, ()I remediation was initiated in <br />April 2016. Since remediation was implemented, maximum benzene <br />concentrations in groundwater have declined from approximately 4,400 <br />micrograms per liter (i.tg/L) to 1,700 pg/L. The RWQCB has directed that OI be <br />performed until benzene concentrations are remediated to less than 1,000 tg/L, <br />due to the agencies belief that a benzene plume length of less than 250 feet cannot <br />be adequately demonstrated at this time. <br />SCOPE OF WORK <br />The objectives of the proposed scope of work are to: <br />. <br />Further assess the vertical and lateral extent of petroleum hydrocarbon impact to <br />05 groundwater. <br />Additionally characterize geologic conditions (subsurface strata) at the Site, in <br />particular below approximately 35 feet bgs. <br />I Evaluate c9nc-911trations of fuel contaJniIants in shallow soil gas. \O <br />'I accomplish these objectives, Stratus is prop mg the following work activities: <br />Advance two (2) cone penetrometer test borings (CPT-1 and CPT-2) to <br />approximately 90 feet bgs for profiling of soil lithologies. <br />Collect depth discrete groundwater samples from separate borings immediately <br />adjacent to the CPT profiling boreholes. <br />Drill and install two (2) offsite groundwater monitoring wells (MW-12 and MW- <br />13) to approximately 30 to 35 feet bgs using hollow stem augers. <br />Collect soil samples in 5-foot intervals during the advancement of well borings <br />MW-12 and MW-13 for lithologic comparison. <br />Develop and sample wells MW-12 and MW-13. <br />Install three (3) soil gas monitoring probe wells (SG-1 through SG-3) to <br />approximately 5 feet bgs using hand tools. <br />Collect soil gas samples from SG-1 through SG-3. <br />The proposed scope of work has been subdivided into four tasks, as outlined below. All <br />work will be conducted under the direct supervision of a State of California Professional <br />Geologist or Professional Engineer, and will be conducted in accordance with standards <br />established by the Tr-Regional Board Staff Recommendations of Preliminary <br />Investigation and Evaluation of Underground Tank Sites (RWQCB, April 2004). <br />KAI:lames Trucking\Work Plans \barnes trucking work plan 2017.doc STRATUS