Ms. Vera Fischer, P.G., RWQCB April 24, 2017 <br />Work Plan for Additional Site Assessment Project No. 2154-1817-01 <br />1817 South Fresno Avenue, Stockton, CA <br />Page 5 <br />Appendix A includes descriptions of field procedures that will be utilized during this <br />phase of investigation. Proposed drilling locations are shown on Figures 2 and/or 3. In <br />the event that permission to install wells MW-12 and MW-13 at the proposed locations is <br />denied, alternate locations for installation of these wells are depicted on Figure 4. <br />Task 1: Pre-Field Activities <br />Following approval of this Work Plan by the RWQCB, the following activities will be <br />completed: <br />Obtain an encroachment permit from the City of Stockton to enable installation of <br />MW-12 and MW-13, <br />Obtain drilling permits from SJCEHD, <br />Retain and schedule a licensed C-57 CPT contractor and drilling contractor, <br />Update the Health and Safety Plan for the Site, <br />Mark boring locations and contact Underground Service Alert to locate <br />underground utilities in the vicinity of the work site, and <br />Notify SJCEHD, the RWQCB, the City of Stockton, and Mr. Barnes of the <br />scheduled field activities. <br />Task 2: Field Activities <br />CPT Borings 45 1)04' <br />Folo/A,e 160711.5 )6 ip-f 14,61 <br />'05 kod <br />Stratus will retain a C-57 licensed contractor to advance the CPT borings. CPT consists <br />of advancing a cone-tipped cylindrical probe (1.7 inches in diameter) into the ground <br />while simultaneously measuring the resulting resistance to penetration. A computer <br />generated CPT log is plotted in the field, providing a continuous log of Site lithology. <br />Upon completion of CPT profiling, to a depth of approximately 90 feet bgs, each of the <br />boreholes will be pressure grouted from the bottom of the borehole up to surface grade. <br />Once the CPT profiling has been performed at CPT-1 and CPT-2, hydropunch <br />groundwater sampling will be performed from an adjacent boring at each location. The <br />hydropunch sampler will be pushed to the bottom of the sampling interval using 2-inch <br />diameter steel rods. The steel rods will then be retracted approximately four feet, <br />exposing the screen, allowing for the collection of depth-discrete groundwater samples. <br />Groundwater sampling depths will be determined at the time of the investigation, and <br />based in part on soil types encountered at depth, however we anticipate collecting <br />approximately 3 to 5 groundwater samples between approximately 40 and 90 feet bgs. <br />The groundwater samples will be collected using a clean bailer, transferred to laboratory- <br />KABarnes Trucking\Work Plans\bames trucking work plan 2017.doc STRATUS