My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FIFTH
>
201
>
2900 - Site Mitigation Program
>
PR0541431
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2021 4:15:01 PM
Creation date
5/28/2021 4:11:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0541431
PE
2953
FACILITY_ID
FA0023745
FACILITY_NAME
DEBOER TRUCKING
STREET_NUMBER
201
Direction
W
STREET_NAME
FIFTH
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
25935013
CURRENT_STATUS
01
SITE_LOCATION
201 W FIFTH ST
P_LOCATION
05
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REC <br />ENVIRONMENTAL <br />OV 2016 <br />HEALTH PERMi T/SER VICES <br />N <br />GOUND AU,I32 <br /> <br />1172 Kansas Avenue, Suite A <br />Modesto, CA 95351 <br />209.522.4119 - PH <br />209.522.4227 - FAX <br />groundzeroanalysis.com <br />November 2, 2016 <br />Project No. 1048 <br />Project Name: FJJC (Ripon) <br />Mr. Harlan Knoll <br />San Joaquin County DEH <br />1868 Hazelton Avenue <br />Stockton, CA 95205-6232 <br />Re: Work Plan: Well Destruction• <br />Location: 201 West 5th Street, Ripon, CA <br />Dear Mr. Knoll, <br />We have prepared the work plan below for the destruction of three monitoring wells on the <br />property located at 201 West 5th Street, Ripon, CA. Refer to the Site Map in Figure 2 for <br />well locations. Also, for your convenience, find attached select file documents regarding the <br />site closure issued in 1996, cross sections and summary data tables of soil and groundwater <br />analysis. <br />Well Destruction <br />The wells proposed for destruction are listed in the attached table along with the relevant <br />grout volume calculations for the well casing and the filter pack. The wells will be destroyed <br />by pressure grouting methods. <br />This work will be entirely on private property, so a Traffic Control plan for the City of Ripon <br />is not needed. <br />The pressure grouting process will be conducted as follows: <br />A total depth measurement will be taken at each well prior to destruction to ensure no <br />obstructions are present within the well casing. <br />A neat cement grout (containing less than 4% bentonite) will be pumped under <br />pressure through a tremie pipe to the bottom of the well. In this manner, the grout <br />will displace the water in the well ensuring that it is completely filled with grout. <br />After the grout has been filled to the top of the well, a pressure cap will be fitted to <br />the casing and the well pressurized to 25 psi for at least five minutes. If the grout
The URL can be used to link to this page
Your browser does not support the video tag.