My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1515
>
2300 - Underground Storage Tank Program
>
PR0545645
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/24/2021 12:15:33 PM
Creation date
6/1/2021 12:45:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0545645
PE
2351
FACILITY_ID
FA0025876
FACILITY_NAME
7 ELEVEN INC #38877
STREET_NUMBER
1515
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15904026
CURRENT_STATUS
01
SITE_LOCATION
1515 E MAIN ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
71 SO-TOOLC PROCEDURE BELOW, STEP 11 B: PREPARE DRILL AND BIT <br /> FOR 71SO-TOOL,SEE PAGE S Confirm that the stop on the 3!9 6"drill bit supplied <br /> FOR 71 SO•TOOLCT,SEE PAGE 10 with the 7150-TOOLC is in the correct position before <br /> drilling. The stop is factory installed at a distance be- <br /> Note: 71 SO-TOOLC can only be used with testable tween 1-3116"to 1-114"from the tip with the 71 SO- <br /> overfill valves of modified as shown below. TOOLC. If the stop is not at the correct position it must <br /> be fixed before drilling, <br /> - _ CAUTION: If the drill stop is not in the proper loca- <br /> tion failure of a pressure decay leak test may result. <br /> _ ' f 71 SO-TOOLC <br /> i <br /> i <br /> Acid a 10-24 UNC thread or similar <br /> to all three legs of the 71 SO- Tip to stop dimension must <br /> TOOLC in the area shown. Use set be 1-3116"to 1-114" <br /> screws to secure tool to upper ,Figure 7 7B <br /> tube. <br /> STEP 12B: DRILL MOLES <br /> 71 SO-TOOLC Modifications for Testable Inlet With the inlet tube and 71 SO-TOOLC in place,carefully <br /> drill a 3116"dlameter hole in the upper tube using the <br /> STEP 96: INSERT 71 SO-TOOL[OVER INLET TUBE hole in the 71 SO-TOOLC as a guide. The drill stop is po- <br /> lo instail the 71 SO-TOOLC(svld separately)over Lhe sitioned so iI will bottvrn out against the toul after the <br /> inlet tube,first loosen the thumb screw,so the tool can bit has drilled through the upper drop tube. If the stop <br /> pass freely over the inlet tube flange. Align the slot on is positioned wrong either no bole will be drilled,ora <br /> the tool with the key on the inlet Mabe and insert the through hole could potentially be drilled through the <br /> tool down. See Figure 9B. inlet tube. If no hole is drilled return to step 11 B and <br /> Tool slot Hand tighten thumb screw check the stop dimension, If a hole is drilled through <br /> the inlet tube or into the screw hole the assembly is not <br /> a salvageable. Drill(2)more holes in the two remaining <br /> guide holes. <br /> 4 <br /> Loosen <br /> thumb t7� <br /> screw <br /> W a � <br /> 17 <br /> nl' <br /> Tube <br /> Key <br /> Dr A through upper tube only <br /> STEP 106: TIGHTEN THE 71 SO-TOOL[ Figure 128 <br /> Ensure that the tool seats flat against the top of the inlet <br /> tube. To prevent vertical movement of the tool during <br /> drilling,hand tighten the thumb screw against the up- <br /> per drop tube. See Figure 108. <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.