My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1515
>
2300 - Underground Storage Tank Program
>
PR0545645
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/24/2021 12:15:33 PM
Creation date
6/1/2021 12:45:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0545645
PE
2351
FACILITY_ID
FA0025876
FACILITY_NAME
7 ELEVEN INC #38877
STREET_NUMBER
1515
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15904026
CURRENT_STATUS
01
SITE_LOCATION
1515 E MAIN ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
71 SO-TOOLCT PROCEDURE BELOW, <br /> FOR 7150-TOOL,SEE PAGE 8 7150-TOOLCT <br /> FOR 71513-TOOLC,SEE PAGE 9 <br /> STEP 9C: INSERT 7154-TOOLCT OVER INLET TUBE <br /> To install the 7150-1UULCT(sold separately)over the <br /> inlet tube,first loosen the thumb strews,so the tool can <br /> pass freely over the inlet tube flange. Align the slot on <br /> the tool with the key on the inlet tube and insert the <br /> tool down. See Figure 9C. Tip to stop dimension must <br /> be 1-3/15"to 1-1/4^ <br /> Loosen Figure]7C <br /> thumb land tighten STEP 12C: DRILL HOLES <br /> screws <br /> Tool Slot thumb screws <br /> With the inlet tube and 7150-TOOLCT in place,carefully <br /> r •..__....._-_.... - drill a 3/16"diameter hole in the upper tube using the <br /> hole in the 715 <br /> `,.;• �';; ' �� � •�:_� `:j�-� O-TUQLCT as a guide. The drill stop is <br /> - , .� �' positioned so it will bottom out against the tool after <br /> l! :•- `.'r� 1 the bit has drilled through the upper drop tube. if the <br /> i9J -i=- ; r:i �-- stop is positioned wrong either no hole will be drilled <br /> or a through hole could potentially be drilled through <br /> the inlet tube. If no hole is drilled return to step i 1 C <br /> [1 and check the stop dimension. If a hole is drilled <br /> - - through the inlet tube or into the screw hole the assem- <br /> bly is not salvageable. Drill(2)more holes in the two <br /> Inlet remaining guide holes. <br /> Tube <br /> i Key <br /> Figure 9C Figure]OC <br /> T <br /> STEP 14C: TIGHTEN THE 71 SO-TOOLCT _ <br /> Ensure that the tool seats flat against the top of the inlet <br /> tube. To prevent vertical movement of the tool during Urill through upper tube only <br /> drilling,hand tighten the thumb screws against the up- <br /> per drop tube. See Figure 1 OC. <br /> STEP I M PREPARE DRILL AND BIT <br /> Confirm that the stop on the 3/16"drill bit supplied Figure 12C <br /> with the 71 SO-TOOLCT is in the correct position before <br /> drilling. The stop is factory installed at a distance be- <br /> tween: 1-3/16"to 1-1/4"from the tip with the 71 SO- <br /> TOOLCT. If the stop is not at the correct position it must <br /> be fixed before drilling. <br /> CAUTION:if the drill stop is not in the proper loca- <br /> tion failure of a pressure decay leak test may result. <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.