My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1515
>
2300 - Underground Storage Tank Program
>
PR0545645
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/24/2021 12:15:33 PM
Creation date
6/1/2021 12:45:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0545645
PE
2351
FACILITY_ID
FA0025876
FACILITY_NAME
7 ELEVEN INC #38877
STREET_NUMBER
1515
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15904026
CURRENT_STATUS
01
SITE_LOCATION
1515 E MAIN ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STEP 18: LOWER TUBE ASSEMBLY FOR STANDARD VAPOR TIGHT MODELS,PROCEED <br /> If a vise is used,clamp on the valve body casting only to TO STEP 20 ON PAGE 14. <br /> avoid damage to the float and tubes. Thread the lower <br /> tube onto the valve body until the lower tube bottoms FOR TESTABLE MODELS,PROCEED TO PAGE 13. <br /> out on valve body. Tube can be tightened by hand or <br /> with a strap wrench. It a strap wrench is used try to po- <br /> sition it on the threaded insert portion of the lower tube <br /> to prevent damaging the tube. <br /> Figure 1a Threaded insert <br /> NOTE:Before installing the valve in the tank,a pres- <br /> sure test can be performed on the valve to check for <br /> vapor tightness. Seal off both ends of the tube with <br /> inflatable plumber's plugs.Apply a maximum I li" <br /> W.C.(1/3 PSI)air pressure. If pressure does not hold <br /> and a leak can be located with soap solution,do not <br /> Install the valve. Send the valve back to OPW for <br /> warranty evaluation. <br /> CAUTION:Do not over-pressurize. Excess pressure <br /> can damage the valve. <br /> STEP 19: CUT LOWER TUBE <br /> Measuring from the underside of the inlet tube flange, <br /> mark the overall length of the drop tube a distance of <br /> (8)minus 6". Determine dimension(B)from the meas- <br /> urements taken in Step 1,Figure 1 (Top of the Face Seal <br /> Adapter below the drain valve outlet in the spill con- <br /> tainer to the bottom of the tank). Saw off the excess <br /> tube at a 45-degree angle or per local codes or require- <br /> ments and file off any sharp burrs(Refer to Figure 24). <br /> Optional: Install the OPW Tank Bottom Protector <br /> on the lower tube(Refer to Installation instructions sup- <br /> plied with the Tanis Bottom Protector). <br /> IMPORTANT:Remove all chips and shavings out of <br /> the cut end of the tube. DO NOT remove chips and <br /> shavings by dumping thru valve body. <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.