My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1515
>
2300 - Underground Storage Tank Program
>
PR0545645
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/24/2021 12:15:33 PM
Creation date
6/1/2021 12:45:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0545645
PE
2351
FACILITY_ID
FA0025876
FACILITY_NAME
7 ELEVEN INC #38877
STREET_NUMBER
1515
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15904026
CURRENT_STATUS
01
SITE_LOCATION
1515 E MAIN ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STEP 13: DIMPLE FIRST HOLE STEP 15: DIMPLE REMAINING HOLES <br /> Remove tool. Remove any chips or burrs from the drill- Remove any chips or burrs from the drilling operation. <br /> ing operation. Place the assembly on a solid surface. Dimple the next(2)holes as done in Step 13. Make sure <br /> Using the punch supplied with the 71 SO-TOOL,71 SO- the assembly is on a solid surface when punching. After <br /> TOOLC,and 71 SO-TOOLCT,align the tip of the punch punching,remove any chips that may have fallen into <br /> with the drilled hole and dimple the upper drop tube by the inlet tube screw hole. <br /> striking the punch with a hammer until the drop tube is <br /> formed into countersunk hole in the inlet tube. After <br /> punching,remove any chips that may have fallen into <br /> the inlet tube screw hole. <br /> Align punch with <br /> drilled hole <br /> Figure 15 <br /> ® STEP 16: ASSEMBLE OTHER SCREWS <br /> Apply black moly grease to screws and tighten the oth- <br /> er(2)screws into inlet tube with a screwdriver as done <br /> Figure 13 in Step 14. Use only the taptite screws that are supplied <br /> with the unit. Seating torque is 20 in-lbs min.to 35 in- <br /> STEP 14: ASSEMBLE FIRST SCREW lbs max. Do not over tighten. <br /> I=nsure that the drop tube was formed into the counter., <br /> sunk screw hole as shown in Figure 14 if not return to STEP 17: APPLY GREASE TO LOWER O-RING AND <br /> Step 13. Apply black moly grease to screw and tighten BODY THREADS <br /> first screw into inlet tube with a.screwdriver. Use only Apply black moly grease to the lower tube o-ring and <br /> the taptite screws that are supplied with the unit. Seat- body threads as shown. Make sure coverage is com- <br /> ing torque is 20 in-lbs min.to 35 in-lbs max. Screw head pletely around the o-ring. Install o-ring in groove just <br /> should be flush with the drop tube. Do not over tight- above threads. <br /> en. <br /> Applygrease <br /> around o-ring <br /> Ensure the drop tutee is formed Into <br /> wu ntersunk hale <br /> O-ring <br /> Figure 14 groove Body threads <br /> Figure 17 <br /> �t <br />
The URL can be used to link to this page
Your browser does not support the video tag.